Physical Analysis such as delayering, cross-sectioning, FIB, sample preparation for further analysis, including TEM preparation when required, and TEM operation for imaging and EDX elemental analysis
Maintain accurate and detailed documentation of all quality control activities, including inspection reports, non-conformance records, and corrective action plans.
Ensure inspection and testing results are properly recorded, reviewed, and entered the applicable quality system/ MES with complete supporting documentation.