53 Test Engineering Jobs in Johor - September 2026 - High Salaries

Showing 53 jobs results for "test engineering" in Johor
Never miss any updates for Test Engineering jobs in Johor
MYR4,000 - MYR6,000 Per Month
  • Testing High/Low Voltage switchgear, UPS systems, Backup Generators, and Power Distribution Units (PDUs).
  • Ensure that all finished products and components meet strict quality, functional, and safety specifications. Involves setting up test equipment, troubleshooting failures, and collaborating with cross-functional teams to improve product reliability and yield.
  • Conduct hands-on testing across different levels (from factory inspections to full Integrated Systems Testing). ...
Posted
13 days ago
MYR2,500 - MYR3,100 Per Month
Fresh Graduates
  • Location: Pasir Gudang, Johor
  • Shift Hours (Must be open to rotating shifts):
  • Day: 7:00 AM – 4:00 PM ...
Posted
a month ago
MYR1,700 - MYR2,000 Per Month
  • Merekod dan melengkapkan keputusan ujian dengan tepat.
  • Melaporkan sebarang keputusan yang tidak mematuhi spesifikasi kepada penyelia.
  • Membantu dalam aktiviti kawalan kualiti serta tugasan lain yang diarahkan dari semasa ke semasa. ...

Be an early applicant!

Posted
10 days ago
premium banner
MYR4,000 - MYR6,000 Per Month
  • Planning: Assist the program manager in planning the mechanical design and managing future work if required by preparing development plans. Preparing validation testing plans. Co-ordinate development work covering hardware, software, mechanical. Preparation of documentation. Publish progress reports. Close liaison with suppliers and sub-contractors.
  • Testing and validation of designs by ensuring design meets the specification. Ensuring that the design operates correctly and is fit for its intended purpose. Ensuring that test results are kept in an approved format.
  • Documentation: Ensure the design is documented to appropriate standards. Develop mechanical design descriptions. Develop and maintain the product hierarchy ...
Mechanical Design CAD Software (e.g.
+3
Posted
10 days ago
MYR3,000 - MYR5,000 Per Month
Fresh Graduates
  • Identify whether processes involve cutting, welding, or other methods.
  • Conduct or oversee metal testing procedures.
  • Receive samples from clients and verify the required tests. ...
Posted
14 days ago
premium banner
MYR4,800 - MYR6,000 Per Month
  • RFI & Technical Coordination – Raise and track RFIs for unclear or conflicting information and coordinate with HQ engineering/consultants for timely resolution.
  • Buildability & As-Built – Identify design/buildability issues early and progressively update as-built information throughout construction.
  • Material Approval & Delivery – Prepare material submissions, track consultant/client approvals, coordinate delivery schedules, and monitor lead-time risks. ...
Construction codes Project management
+4
Posted
15 hours ago
MYR3,000 - MYR5,000 Per Month
Fresh Graduates
  • Identify whether processes involve cutting, welding, or other methods.
  • Conduct or oversee metal testing procedures.
  • Receive samples from clients and verify the required tests. ...
Posted
14 days ago
MYR4,000 - MYR6,000 Per Month
Fresh Graduates
  • Conduct regular site patrols to promptly identify dimensional deviations, non-compliant operations and quality defects. Issue rectification notices, follow up and review rectification progress to achieve closed-loop management.
  • Conduct inspection, record-keeping and image archiving for concealed works. Cooperate with supervisors, the Employer and competent government authorities on acceptance of divisional, sub-divisional works and final project acceptance, and sort out quality acceptance documents in advance.
  • Be familiar with construction codes, standard atlases, design drawings and special construction schemes. Deliver quality disclosures to construction teams and rectify irregular operations. ...
Quality Assurance Quality Control
+3
Posted
3 months ago
MYR3,000 - MYR5,000 Per Month
  • · Prepare and operate NDT equipment and ensure the equipment is properly calibrated and in good working condition.
  • · Ensure all inspection results comply with the applicable acceptance criteria and quality requirements.
  • · Maintain proper identification and traceability of inspected materials and components. ...
Ultrasonic Testing (UT) Non-Destructive Testing (NDT)
+2
Posted
17 days ago
MYR4,800 - MYR6,000 Per Month
  • RFI & Technical Coordination – Raise and track RFIs for unclear or conflicting information and coordinate with HQ engineering/consultants for timely resolution.
  • Buildability & As-Built – Identify design/buildability issues early and progressively update as-built information throughout construction.
  • Material Approval & Delivery – Prepare material submissions, track consultant/client approvals, coordinate delivery schedules, and monitor lead-time risks. ...
Construction codes Project management
+4
Posted
a month ago
MYR4,800 - MYR6,000 Per Month
  • RFI & Technical Coordination – Raise and track RFIs for unclear or conflicting information and coordinate with HQ engineering/consultants for timely resolution.
  • Buildability & As-Built – Identify design/buildability issues early and progressively update as-built information throughout construction.
  • Material Approval & Delivery – Prepare material submissions, track consultant/client approvals, coordinate delivery schedules, and monitor lead-time risks. ...
Construction codes Project management
+4
Posted
a month ago
MYR4,800 - MYR6,000 Per Month
  • RFI & Technical Coordination – Raise and track RFIs for unclear or conflicting information and coordinate with HQ engineering/consultants for timely resolution.
  • Buildability & As-Built – Identify design/buildability issues early and progressively update as-built information throughout construction.
  • Material Approval & Delivery – Prepare material submissions, track consultant/client approvals, coordinate delivery schedules, and monitor lead-time risks. ...
Construction codes Project management
+4
Posted
a month ago
MYR4,800 - MYR6,000 Per Month
  • RFI & Technical Coordination – Raise and track RFIs for unclear or conflicting information and coordinate with HQ engineering/consultants for timely resolution.
  • Buildability & As-Built – Identify design/buildability issues early and progressively update as-built information throughout construction.
  • Material Approval & Delivery – Prepare material submissions, track consultant/client approvals, coordinate delivery schedules, and monitor lead-time risks. ...
Construction codes Project management
+4
Posted
a month ago
  • Ability to work under pressure and maintain deadlines
  • Ability to work in a team as well as an individual
  • Attention to details ...
Posted
10 days ago

Malaysia

  • Drive improvement in FPY, test yield, retest rate, test coverage, MTTD, MTTR, cycle time, tester uptime and customer escapes.
  • Oversee test hardware, fixtures, instrumentation, ATE, test software and automation.
  • Improve tester reliability, capacity, utilization and maintenance. ...
Posted
3 days ago

Kes Systems & Service

  • Troubleshoots boards: driver and burn-in boards
  • Records troubleshooting data
  • Support Production for boards testing ...
Posted
4 days ago

GES Manufacturing Services

  • Plan and review test department budget
  • Dispose or return non-active, End of Life or obsolete test equipment
  • Plan and ensure sufficient test equipment and capacity ...
Posted
8 days ago

IOT MANUFACTURING SDN BHD

  • Develop and improve test methods, fixtures and test setups to enhance accuracy, repeatability and efficiency.
  • Analyse test data, identify performance issues and support root cause investigations.
  • Prepare technical reports and present test findings to engineering and project teams. ...
Posted
7 days ago

Beyonics Pte Ltd

  • Vendor Management: Work with vendors to design FCT testers and ICT fixtures that provide the best possible test coverage.
  • Inventory Control: Lead debug technicians to reduce debug work-in-progress (WIP) inventory.
  • Equipment Maintenance: Ensure efficient tester troubleshooting and eliminate downtime for test equipment. ...
Posted
18 days ago

V.S. Industry Berhad

Posted
19 days ago

Microtronics Technology Sdn Bhd

  • Interface with suppliers and vendors to ensure smooth production delivery
  • Participate in product launch and continuous improvement activities
  • Ensure compliance with industry standard, regulation & quality requirement ...
Posted
19 days ago
  • Analyze test data and identify opportunities to improve product quality, test yield, and process efficiency.
  • Design, modify, and improve test fixtures and equipment to meet production requirements.
  • Prepare and maintain test specifications, work instructions, test procedures, and related technical documentation. ...
Posted
20 days ago
  • Record test results accurately and maintain proper testing documentation.
  • Troubleshoot test failures and identify basic equipment, fixture, or product-related issues.
  • Escalate recurring or complex test issues to the Test Engineer or relevant department. ...
Posted
20 days ago
  • Develop and maintain test tool programs according to product specifications.
  • Optimize and improve the reliability and stability of test programs.
  • Familiarize with production processes to increase the automation ratio of production lines. ...
Posted
22 days ago
  • Test/Debug: 1 year (Preferred)
  • Job Desription:
  • · Perform failure analysis for production fallouts ...
Posted
19 days ago

SKP BM Electronics Sdn Bhd

  • Diploma or degree in Electrical/Electronic Engineering, Mechatronics, or a related technical field.
  • Experience in EMS or electronics manufacturing environment is an advantage.
  • Ability to interpret schematics, specifications, and technical documentation. ...
Posted
a month ago
  • Record test results accurately and maintain proper testing documentation.
  • Troubleshoot test failures and identify basic equipment, fixture, or product-related issues.
  • Escalate recurring or complex test issues to the Test Engineer or relevant department. ...
Posted
a month ago
  • Analyze test data and identify opportunities to improve product quality, test yield, and process efficiency.
  • Design, modify, and improve test fixtures and equipment to meet production requirements.
  • Prepare and maintain test specifications, work instructions, test procedures, and related technical documentation. ...
Posted
a month ago

V.S. Industry Berhad

Posted
a month ago
  • Tech Innovation: Evaluate and introduce next-generation manufacturing test technologies and methodologies to continuously improve test accuracy, cycle time, and cost-efficiency.
  • Operations & Mentorship: Develop comprehensive training materials, preventive maintenance plans, and troubleshooting guides to upskill Test Technicians on the production line.
  • Education: Bachelor’s Degree in Electrical Engineering, Mechanical Engineering, Mechatronics, or a related discipline. ...
Posted
10 days ago