Responsibilities:Perform installation, termination, testing and labeling of cabling for CAT5e/CAT6, coaxial and fiber.Perform site survey at any assigned locations and produce full report on findings.Perform installation of caging, data center containment, cable containment, rack, IT equipment and other electrical/electornic devices.Perform structural works such as painting, piping, demolition, partitioning etc.Perform cabling troubleshooting onsite as and when required.Purchase and collection of urgently required/unscoped materials.Assisting in warehousing works such as receiving, sorting, and stocking items.
Requirements:
Minimum 1 year working experiences in Data Center works or similar....
Documentation: Maintain organized and accurate records of project work, including test results, designs, and project-related data. Prepare technical reports and user manuals as needed to ensure clear communication of project outcomes
Currently studying towards a degree in Mechanical Engineering, Chemical Engineering or a related field.
progress, service request report closure, shipment progress, arrange schedule for on-site calibration job and deal with vendor for any calibration issues.
Ensure all calibration documents and practices are in compliance to applicable procedures and quality standards
Analyze and enhance IMTE performance, accuracy, stability, serviceability and improvement opportunity on system/ IMTE....
Performs preventative maintenance activities as per documented schedules and standards on power generation products in the field.
Escalates unresolved issues to more experienced Field Service Technicians and/or Supervisor Completes required documentation, such as service worksheets, timesheets, warranty claims, quality documents via handwritten forms or business system input screens.
Completes training in line with skill and business requirements...
Diagnose breakdown or malfunction of equipment (heating, air conditioners, cold rooms, refrigerators) and proceed with troubleshooting and repair
Position and secure the groups, condensers, tubes , electrical cables for the refrigeration or air conditioning installation
Check the conformity of the installation, check the tightness and determine the refrigerant charge, evacuate the installation and charge the circuit...
· Power Infrastructure Build: Supervise the installation of HT/MV/LV switchgears, transformers, diesel generators, UPS systems, and Power Distribution Units (PDUs).
· Testing Oversight: Lead the site testing for electrical systems, including insulation testing, protection relay calibration, and load bank testing....
· Power Infrastructure Build: Supervise the installation of HT/MV/LV switchgears, transformers, diesel generators, UPS systems, and Power Distribution Units (PDUs).
· Testing Oversight: Lead the site testing for electrical systems, including insulation testing, protection relay calibration, and load bank testing....
· Power Infrastructure Build: Supervise the installation of HT/MV/LV switchgears, transformers, diesel generators, UPS systems, and Power Distribution Units (PDUs).
· Testing Oversight: Lead the site testing for electrical systems, including insulation testing, protection relay calibration, and load bank testing....
· Cooling Plant Installation: Supervise the installation of industrial chillers, cooling towers, CRAH/CRAC units, chilled water pipe networks, and pumps.
· Airflow Management: Ensure raised flooring, hot/cold aisle containment, and ductworks are tightly sealed and installed to specification....
· Cooling Plant Installation: Supervise the installation of industrial chillers, cooling towers, CRAH/CRAC units, chilled water pipe networks, and pumps.
· Airflow Management: Ensure raised flooring, hot/cold aisle containment, and ductworks are tightly sealed and installed to specification....
· Cooling Plant Installation: Supervise the installation of industrial chillers, cooling towers, CRAH/CRAC units, chilled water pipe networks, and pumps.
· Airflow Management: Ensure raised flooring, hot/cold aisle containment, and ductworks are tightly sealed and installed to specification....
· Specialized Suppression: Oversee the installation of data centre-specific fire systems, including Pre-Action sprinklers and Gas Suppression Systems (e.g., FM-200, Novec 1230, or Inert gas).
· Early Detection: Supervise the deployment of VESDA (Very Early Smoke Detection Apparatus) and regular smoke detector networks....
· Inspections: Conduct daily site inspections and issue Non-Conformance Reports (NCR) when work does not meet structural or quality standards.
· Documentation: Prepare, organize, and maintain the Project Quality Plan, including Material Inspection Requests (MIR) and Work Inspection Requests (WIR)....
· Inspections: Conduct daily site inspections and issue Non-Conformance Reports (NCR) when work does not meet structural or quality standards.
· Documentation: Prepare, organize, and maintain the Project Quality Plan, including Material Inspection Requests (MIR) and Work Inspection Requests (WIR)....
· Inspections: Conduct daily site inspections and issue Non-Conformance Reports (NCR) when work does not meet structural or quality standards.
· Documentation: Prepare, organize, and maintain the Project Quality Plan, including Material Inspection Requests (MIR) and Work Inspection Requests (WIR)....