jobs in AG STAFFING

AG STAFFING Hiring! Full Time Electrical Engineers (Data Centre Construction) JB in Johor, Earn up to MYR 12,000 - Ricebowl

Electrical Engineers (Data Centre Construction) JB

Share
Save

Working Location

  • Johor Bahru Johor Malaysia

Job Description

Responsibilities

.Job Description: Electrical Engineer

Position Purpose

The Electrical Engineer owns the power infrastructure of the data centre. This role manages everything from the high-voltage utility connection down to the server racks, ensuring continuous, redundant power distribution.

Key Responsibilities

· Power Infrastructure Build: Supervise the installation of HT/MV/LV switchgears, transformers, diesel generators, UPS systems, and Power Distribution Units (PDUs).

· Testing Oversight: Lead the site testing for electrical systems, including insulation testing, protection relay calibration, and load bank testing.

· Authority Liaison: Coordinate with local utility providers (like TNB) and regulatory bodies for testing, energization, and permanent power connection.

· Safety & Compliance: Ensure all electrical installations comply with local safety standards, electrical grid codes, and site health guidelines.

Job Types: Full-time, Contract

Pay: RM6,000.00 - RM12,000.00 per month

Work Location: In person

Important Information

Never provide your bank or credit card details when applying for jobs. Do not transfer any money or complete unrelated online surveys. If you see something suspicious, Report this Job ad.

Learn More