54 Engineer Internship Jobs in Nusajaya - October 2026 - High Salaries

Showing 54 jobs results for "engineer internship" in Nusajaya
Never miss any updates for Engineer Internship jobs in Nusajaya

Gerbang Nusajaya

  • To inform superior/ Shift engineer immediately if the testing result was out- of- specification.
  • Review analysis results and ensure no lab error prior to final product disposition.
  • Troubleshooting of lab instrument error and report to service provider if could not resolve the issue. Monitor and restore instrument performance to optimum level. ...
Posted
14 days ago

Gerbang Nusajaya

  • Reads and interprets blueprints and wiring diagrams.
  • Coordinates activities with other trades areas and outside contractors.
  • Maintains records of jobs performed departmental charge codes and hours worked. ...
Posted
21 days ago

Gerbang Nusajaya

  • Support material characterisation and evaluation using appropriate analytical and testing techniques.
  • Develop, test and optimise polymer formulations, adhesive systems and material combinations for extrusion, coating, lamination and other applications.
  • Conduct research and development to innovate new products and improve existing products. ...
Posted
a day ago
WFH

Gerbang Nusajaya

  • Salary: RM 4,000 ++(Based on Exp)
  • * Prepare, update and monitor project progress schedules using MS Project / Excel
  • * Track actual site progress and update progress reports (weekly / monthly) ...
Posted
a day ago

Gerbang Nusajaya

  • Install and align all relevant auxiliary equipment (punches, secondary dies, edge guides, eye block readers).
  • Clean dies and return to storage area.
  • Check the sample of finish product from the end of the machine and inspect for imperfections. ...
Posted
a month ago

Gerbang Nusajaya

  • Conduct slump testing
  • Have an idea / conduct asphalt testing (preferable)
  • Prepare and compile reports ...
Posted
19 days ago

Gerbang Nusajaya

  • Reads and interprets blueprints and wiring diagrams.
  • Coordinates activities with other trades areas and outside contractors.
  • Maintains records of jobs performed departmental charge codes and hours worked. ...
Posted
a month ago

Gerbang Nusajaya

  • Conduct slump testing
  • Have an idea / conduct asphalt testing (preferable)
  • Prepare and compile reports ...
Posted
a day ago

Gerbang Nusajaya

  • Conduct slump testing
  • Have an idea / conduct asphalt testing (preferable)
  • Prepare and compile reports ...
Posted
a day ago

Gerbang Nusajaya

  • Support material characterisation and evaluation using appropriate analytical and testing techniques.
  • Develop, test and optimise polymer formulations, adhesive systems and material combinations for extrusion, coating, lamination and other applications.
  • Conduct research and development to innovate new products and improve existing products. ...
Posted
a month ago

Gerbang Nusajaya

  • Conduct slump testing
  • Have an idea / conduct asphalt testing (preferable)
  • Prepare and compile reports ...
Posted
14 days ago

Gerbang Nusajaya

  • Conduct slump testing
  • Have an idea / conduct asphalt testing (preferable)
  • Prepare and compile reports ...
Posted
22 days ago

Gerbang Nusajaya

  • Key Responsibilities
  • · Power Infrastructure Build: Supervise the installation of HT/MV/LV switchgears, transformers, diesel generators, UPS systems, and Power Distribution Units (PDUs).
  • · Testing Oversight: Lead the site testing for electrical systems, including insulation testing, protection relay calibration, and load bank testing. ...
Posted
a day ago

Gerbang Nusajaya

  • Key Responsibilities
  • · Site Coordination: Oversee and coordinate day-to-day installation activities for all MEP trades on the construction floor.
  • · Progress Tracking: Monitor subcontractor performance against the master construction schedule to prevent delays. ...
Posted
a day ago

Gerbang Nusajaya

  • Key Responsibilities
  • · Specialized Suppression: Oversee the installation of data centre-specific fire systems, including Pre-Action sprinklers and Gas Suppression Systems (e.g., FM-200, Novec 1230, or Inert gas).
  • · Early Detection: Supervise the deployment of VESDA (Very Early Smoke Detection Apparatus) and regular smoke detector networks. ...
Posted
a day ago

Gerbang Nusajaya

  • Key Responsibilities
  • · Cooling Plant Installation: Supervise the installation of industrial chillers, cooling towers, CRAH/CRAC units, chilled water pipe networks, and pumps.
  • · Airflow Management: Ensure raised flooring, hot/cold aisle containment, and ductworks are tightly sealed and installed to specification. ...
Posted
a day ago

Gerbang Nusajaya

  • Key Responsibilities
  • · Inspections: Conduct daily site inspections and issue Non-Conformance Reports (NCR) when work does not meet structural or quality standards.
  • · Documentation: Prepare, organize, and maintain the Project Quality Plan, including Material Inspection Requests (MIR) and Work Inspection Requests (WIR). ...
Posted
a day ago

Gerbang Nusajaya

  • Key Responsibilities
  • · BMS & Controls: Supervise the installation of Building Management Systems (BMS), SCADA, and Environmental Monitoring Systems (EMS) to track temperatures and power usage.
  • · Network Infrastructure: Manage the installation of structured cabling, including pathways, containment, and termination of high-strand fibre optic and copper cables. ...
Posted
a day ago

Gerbang Nusajaya

  • Key Responsibilities
  • · Site Coordination: Oversee and coordinate day-to-day installation activities for all MEP trades on the construction floor.
  • · Progress Tracking: Monitor subcontractor performance against the master construction schedule to prevent delays. ...
Posted
25 days ago

Gerbang Nusajaya

  • Key Responsibilities
  • · Power Infrastructure Build: Supervise the installation of HT/MV/LV switchgears, transformers, diesel generators, UPS systems, and Power Distribution Units (PDUs).
  • · Testing Oversight: Lead the site testing for electrical systems, including insulation testing, protection relay calibration, and load bank testing. ...
Posted
25 days ago

Gerbang Nusajaya

  • Key Responsibilities
  • · Inspections: Conduct daily site inspections and issue Non-Conformance Reports (NCR) when work does not meet structural or quality standards.
  • · Documentation: Prepare, organize, and maintain the Project Quality Plan, including Material Inspection Requests (MIR) and Work Inspection Requests (WIR). ...
Posted
25 days ago

Gerbang Nusajaya

  • Key Responsibilities
  • · Cooling Plant Installation: Supervise the installation of industrial chillers, cooling towers, CRAH/CRAC units, chilled water pipe networks, and pumps.
  • · Airflow Management: Ensure raised flooring, hot/cold aisle containment, and ductworks are tightly sealed and installed to specification. ...
Posted
25 days ago

Gerbang Nusajaya

  • Key Responsibilities
  • · Specialized Suppression: Oversee the installation of data centre-specific fire systems, including Pre-Action sprinklers and Gas Suppression Systems (e.g., FM-200, Novec 1230, or Inert gas).
  • · Early Detection: Supervise the deployment of VESDA (Very Early Smoke Detection Apparatus) and regular smoke detector networks. ...
Posted
25 days ago

Gerbang Nusajaya

  • Key Responsibilities
  • · BMS & Controls: Supervise the installation of Building Management Systems (BMS), SCADA, and Environmental Monitoring Systems (EMS) to track temperatures and power usage.
  • · Network Infrastructure: Manage the installation of structured cabling, including pathways, containment, and termination of high-strand fibre optic and copper cables. ...
Posted
25 days ago