Track IFC drawing revisions, site changes, and design developments (especially MEP interfaces such as chillers, UPS, generators, and fire protection systems).
Prepare, negotiate, and finalize Variation Orders (VOs) with the Employer's Quantity Surveying consultants, ensuring timely rate agreement and approvals.
...
Building Envelope, Waterproofing & Thermal Integrity:
Enforce zero-leakage roofing systems (e.g., reinforced TPO/PVC membranes or double-layer standing seam metal roofing with robust secondary drainage).
Ensure wall and ceiling envelope construction achieves required U-values (thermal insulation) and vapor barrier continuity to eliminate condensation and facilitate room integrity fan tests (Door Fan Test for gas suppression zones).
...