Champion Innovation and Cost Efficiency: Collaboratively integrate advanced testing technologies, research, and adopt cost-saving solutions like Test Time Reduction (TTR) and new test platforms, driving CAPEX reduction. Continuously improve test programsand test infrastructure to enhance product quality and reliability.
Technical Expertise and Support: Provide leadership in electrical failure analysis (EFA), exploring new test method/EFAtechnique to addressRMAs, production, reliability, and DPPM improvement. Analyze test results and deliver reports to stakeholders with actionable insights for improvement.
Technical Communication and Documentation:Develop and deliver clear, concise technical reports and documentation, including EFA, work instructions, test equipment guidelines, test reports, and specifications.
...
Minimum 3-4 years’ experience in machinery installation or maintenance preferred with Diploma/Certificate in Electrical/Engineering, Wireman (PW4), Chargeman (AO), or equivalent.
Experience in Electrical Control Panel, Instrumentation & HVAC System
Prepare overall planning for projects including, procurement, fabrication, testing until delivery through Master Project Schedule, Vendor master Document List and Procurement Plan.
Compile, review all project specification and distribute to all departments.
Prepare, compile and submit engineering data sheet e.g Motor Data Sheet, Fan Drive Data Sheet, Bearing Data Sheet, Vibration Transmitter Data Sheet etc.
...