Must be a Registered Inspector of Works (IOW) with the Board of Engineers Malaysia (BEM) and possess a valid registration throughout the project duration.
...
Currently enrolled in or recently graduated from a degree programme in Civil Engineering, Structural Engineering, Mechanical Engineering, or Electrical Engineering
Strong understanding of civil and structural engineering principles, materials, and construction methods
Proficiency or willingness to learn CAD software (AutoCAD, Revit, or similar tools)
...
Currently enrolled in or recently graduated from a degree programme in Civil Engineering, Structural Engineering, Mechanical Engineering, or Electrical Engineering
Strong understanding of civil and structural engineering principles, materials, and construction methods
Proficiency or willingness to learn CAD software (AutoCAD, Revit, or similar tools)
...
Bills of Material (BOM) – exposure to preparation and reviewing the BOM of projects, detailing quantities and types of precast components and estimating raw materials required for precast production (concrete, steel reinforcement, welded mesh, cast-in items, etc.).
Material Consumption Analysis – assist in analyzing and monitoring actual material consumption versus approved shop drawings and BOM.
Production Wallchart Updating – perform updating of production wallchart to align factory teams with revised drawings and minimize errors and delays.
...
Bills of Material (BOM) – exposure to preparation and reviewing the BOM of projects, detailing quantities and types of precast components and estimating raw materials required for precast production (concrete, steel reinforcement, welded mesh, cast-in items, etc.).
Material Consumption Analysis – assist in analyzing and monitoring actual material consumption versus approved shop drawings and BOM.
Production Wallchart Updating – perform updating of production wallchart to align factory teams with revised drawings and minimize errors and delays.
...