Collaborate with consultants to review design drawings, specifications, and technical documents for MEP systems including HVAC, electrical distribution, fire protection, plumbing, and other critical infrastructure.
Participate in coordination meetings to resolve design or technical issues.
Assist in ensuring proper testing, commissioning, and handover of MEP systems, including support during IST (Integrated Systems Testing).
...
Independently review and guide the preparation of MEP drawings (single-line diagrams, equipment layouts, coordination drawings, schematics, as-built drawings, etc.).
Participate in technical clarification meetings, coordinate with clients, consultants, main contractors, and vendors to resolve on-site technical issues.
Support project commissioning (Level 1–5), integrated testing, performance verification, and final handover.
...
· Inspections: Conduct daily site inspections and issue Non-Conformance Reports (NCR) when work does not meet structural or quality standards.
· Documentation: Prepare, organize, and maintain the Project Quality Plan, including Material Inspection Requests (MIR) and Work Inspection Requests (WIR).
...
· Inspections: Conduct daily site inspections and issue Non-Conformance Reports (NCR) when work does not meet structural or quality standards.
· Documentation: Prepare, organize, and maintain the Project Quality Plan, including Material Inspection Requests (MIR) and Work Inspection Requests (WIR).
...
Assist in the preparation and agreement of final accounts, including the handling of any claims to ensure the client gets best value from works undertaken
Create estimates and cost plans for key client developments
Oversee project spend by creating valuations and cost reports, and clearly communicate variations to your team
...
Critical Path Mitigation: Manage production, factory inspections, logistics, and site delivery dates for multi-million dollar long-lead machinery (e.g., chillers, cooling towers, continuous-duty generators, modular UPS blocks).
Work Package Master Scheduling: Construct and maintain detailed, integrated MEP construction programs using MS Project or Primavera P6, adapting to compressed fast-track hyperscale schedules.
FAT/SAT Accountability: Approve and witness Factory Acceptance Testing (FAT) worldwide and Site Acceptance Testing (SAT) on-site.
...