Earthing Grid Verification: Verifies main substation earthing grid installation using CYMGRD/CDEGS software calculations (IEEE 80 compliance for touch/step potential and total grid resistance below 0.5 ohms).
Utility & Grid Authority Liaison: Serves as the technical interface with Tenaga Nasional Berhad (TNB) and Suruhanjaya Tenaga (ST) for grid connection approvals, Interconnection Operation Manual (IOM) compliance, and Grid Code verification.
Energization & Testing Support: Manages High Voltage (HV) testing, protection relay coordination testing, and system energization leading to the Initial Operation Date (IOD) and Commercial Operation Date (COD).
...