- Pasir Gudang Johor Malaysia
Working Location
Job Description
Responsibilities
Job Description: ELV / BMS / ICT Engineers
Position Purpose
The ELV/BMS/ICT Engineer builds the control systems, security features, and network backbone of the facility. This role ensures the data centre can be monitored and operated safely in real-time.
Key Responsibilities
· BMS & Controls: Supervise the installation of Building Management Systems (BMS), SCADA, and Environmental Monitoring Systems (EMS) to track temperatures and power usage.
· Network Infrastructure: Manage the installation of structured cabling, including pathways, containment, and termination of high-strand fibre optic and copper cables.
· Security Systems: Oversee physical security infrastructure, including biometric access control, turnstiles, and CCTV cameras.
· Integration Testing: Test the software communication links (Modbus, BACnet, SNMP) between MEP hardware and the central control room.
Job Types: Full-time, Contract
Pay: RM6,000.00 - RM12,000.00 per month
Work Location: In person
Important Information
Never provide your bank or credit card details when applying for jobs. Do not transfer any money or complete unrelated online surveys. If you see something suspicious, Report this Job ad.