jobs in AG STAFFING

全职 ELV - BMS - ICT Engineers (Data Centre Construction) JB 工作, 薪水 up to MYR 12,000, AG STAFFING Johor 公司招聘中 - Ricebowl

ELV - BMS - ICT Engineers (Data Centre Construction) JB

分享
保存

工作地点

  • Pasir Gudang Johor Malaysia

职位描述

岗位职责

Job Description: ELV / BMS / ICT Engineers

Position Purpose

The ELV/BMS/ICT Engineer builds the control systems, security features, and network backbone of the facility. This role ensures the data centre can be monitored and operated safely in real-time.

Key Responsibilities

· BMS & Controls: Supervise the installation of Building Management Systems (BMS), SCADA, and Environmental Monitoring Systems (EMS) to track temperatures and power usage.

· Network Infrastructure: Manage the installation of structured cabling, including pathways, containment, and termination of high-strand fibre optic and copper cables.

· Security Systems: Oversee physical security infrastructure, including biometric access control, turnstiles, and CCTV cameras.

· Integration Testing: Test the software communication links (Modbus, BACnet, SNMP) between MEP hardware and the central control room.

Job Types: Full-time, Contract

Pay: RM6,000.00 - RM12,000.00 per month

Work Location: In person

重要安全守则

申请工作时,切勿提供您的银行或信用卡详细资料。不要转账或完成无关的在线调查问卷。如果您发现可疑内容,请举报此招聘广告。

了解更多