To leverage on AI tools to edit or create digital assets. To provide measurement reports for revision works Preferably with experiences 750RM minimum allowance based on experiences.
To leverage on AI tools to edit or create digital assets. To provide measurement reports for revision works Preferably with experiences 750RM minimum allowance based on experiences.
Bills of Material (BOM) – exposure to preparation and reviewing the BOM of projects, detailing quantities and types of precast components and estimating raw materials required for precast production (concrete, steel reinforcement, welded mesh, cast-in items, etc.).
Material Consumption Analysis – assist in analyzing and monitoring actual material consumption versus approved shop drawings and BOM.
Production Wallchart Updating – perform updating of production wallchart to align factory teams with revised drawings and minimize errors and delays.
...
Bills of Material (BOM) – exposure to preparation and reviewing the BOM of projects, detailing quantities and types of precast components and estimating raw materials required for precast production (concrete, steel reinforcement, welded mesh, cast-in items, etc.).
Material Consumption Analysis – assist in analyzing and monitoring actual material consumption versus approved shop drawings and BOM.
Production Wallchart Updating – perform updating of production wallchart to align factory teams with revised drawings and minimize errors and delays.
...