b) Communicate with the Builders’ Project Manager / Engineer / Owner / QP etc. onsite to obtain documents including but not limited to approval letters, documents, plans, drawings etc. pertaining to the on-going and future construction works near the sewers [Note: information related only if work is carried out within the sewer corridor].
Together with the wider test team regularly re-evaluate testing tools against best practices, cloud-based test infrastructure, observability, and AI-enabled engineering practices to improve productivity, defect prevention, and feedback loops across the delivery lifecycle.
Oversee the design and delivery of APIs, real-time and event-driven integrations, message-based interfaces, batch and file-based interfaces, and data feeds.