Project Specifics: Oversee complex structural elements (high-loading floors) and architectural detailing tailored for mission-critical facilities.
Education: Diploma/Degree in Civil/Structural Engineering or Architecture.
Experience: 5–8+ years in CSA supervision, ideally with experience in data centre construction, mission-critical facilities or large-scale industrial projects.
...
Schedule Management: Develop and manage detailed electrical work packages, tracking milestones via MS Project or Primavera P6 to hit strict Ready-for-Service (RFS) deadlines.
Long-Lead Tracking: Monitor the manufacturing and delivery of long-lead equipment (e.g., UPS, generators, transformers) to prevent critical path site delays.
Subcontractor Management: Supervise electrical subcontractors, evaluate progress claims, and manage variation orders (VOs) alongside the commercial team.
...
Security & Access Control Layouts: Design and implement architectural zoning configurations for physical security, including anti-tailgating turnstiles, mantraps, bullet-resistant partitions, and perimeter fencing.
BOMBA Fire Compartmentation: Ensure passive fire protection measures comply with the Uniform Building By-Laws (UBBL), managing fire-rated walls (up to 2 or 4 hours), blast relief dampers, and fire doors.
BIM Spatial Control: Lead Building Information Modeling (BIM) coordination meetings to prevent spatial clashes between structural/architectural elements and complex mechanical ducting or electrical cable trays.
...
Critical Path Mitigation: Manage production, factory inspections, logistics, and site delivery dates for multi-million dollar long-lead machinery (e.g., chillers, cooling towers, continuous-duty generators, modular UPS blocks).
Work Package Master Scheduling: Construct and maintain detailed, integrated MEP construction programs using MS Project or Primavera P6, adapting to compressed fast-track hyperscale schedules.
FAT/SAT Accountability: Approve and witness Factory Acceptance Testing (FAT) worldwide and Site Acceptance Testing (SAT) on-site.
...
Schedule Management: Develop and manage detailed electrical work packages, tracking milestones via MS Project or Primavera P6 to hit strict Ready-for-Service (RFS) deadlines.
Long-Lead Tracking: Monitor the manufacturing and delivery of long-lead equipment (e.g., UPS, generators, transformers) to prevent critical path site delays.
Subcontractor Management: Supervise electrical subcontractors, evaluate progress claims, and manage variation orders (VOs) alongside the commercial team.
...
BOMBA Integration: Lead the deployment of mission-critical gas suppression systems (e.g., Inergen, FM200, Novec 1230) and Pre-Action dry-pipe sprinkler systems, ensuring strict alignment with BOMBA requirements.
Ventilation & Smoke Extraction: Supervise the installation of pressurization fans, smoke spill systems, and fuel oil supply/storage networks for backup diesel generators.
Long-Lead Management: Track factory production, shipping logistics, and site delivery schedules for long-lead equipment (e.g., chillers, CRAHs, CDUs) to prevent critical path delays.
...
Structured Cabling: Supervise the installation of optical fiber and copper backbone/horizontal cabling systems, including overhead or underfloor cable pathways, splicing, and server room patch frames.
Early Warning Fire Detection: Manage the installation of Very Early Smoke Detection Apparatus (VESDA / Aspirating Smoke Detection) systems to identify structural hazards before open flames erupt.
Interlocking Controls: Coordinate complex logical trip matrices between the fire alarm system, gaseous fire suppression systems, mechanical smoke extraction fans, and electrical door release controls.
...