Optimize HVAC operating strategies based on outdoor weather conditions and IT load requirements to maximize the use of free cooling, improve Power Usage Effectiveness (PUE), and eliminate localized hot spots within the data center.
Maintain cleanliness and good housekeeping in air handling unit (AHU) rooms, switch rooms and other designated plant areas to ensure equipment and facilities are kept in good condition.