Obtain copy of supplier’s production schedule, confirm the supplier has a complete and capable plan for meeting the delivery requirements
Evaluate the supplier's plans and ability to meet the schedule, applying experience-based judgement to critical, complex or high-value packages
Identify potential and actual disruptions in the supplier's submission and delivery schedules, including early warning of systemic or recurring risks across multiple suppliers
...
Analyze and coordinate with master scheduler / Supply Chain team to determine optimal RM
Own overall raw material availability, inventory plan, projection and control, Back-order, Supplier OTD. Raw material Plan (SIOP, PEFP, NPI, EOL, VAVE, LTB) , PO placement, execution, resolve level 1 issue;
Review and analyze materials requirements for production and implement the necessary actions such as generating Purchase Order, scheduling and re-scheduling of material based on MRP requirement.
...
Analyze and coordinate with master scheduler / Supply Chain team to determine optimal RM
Own overall raw material availability, inventory plan, projection and control, Back-order, Supplier OTD. Raw material Plan (SIOP, PEFP, NPI, EOL, VAVE, LTB), PO placement, execution, resolve level 1 issue;
Review and analyze materials requirements for production and implement the necessary actions such as generating Purchase Order, scheduling and re-scheduling of material based on MRP requirement.
...