Collaborate closely with Architecture, Design Verification (DV), and Physical Design teams to achieve Performance, Power, Area (PPA), and timing targets.
Delivered at least one complex system through the full lifecycle, from requirements and architecture through integration, verification and customer acceptance, preferably in air traffic management, aviation, defence, or regulated domain.
Identify potential project risks early and assess its implications to the organisation and project, and to recommend mitigating measures to manage the risks and minimise project delay.
Prepare for, present at and close actions from formal technical reviews, such as SRR, PDR, CDR, TRR and acceptance readiness reviews, with entry and exit criteria that are evidence-based.
Prepare for, present at and close actions from formal technical reviews, such as SRR, PDR, CDR, TRR and acceptance readiness reviews, with entry and exit criteria that are evidence-based.
Collaborate closely with Architecture, Design Verification (DV), and Physical Design teams to achieve Performance, Power, Area (PPA), and timing targets.
Implement high-precision timing control logic to accurately generate the internal timing signals required for various operations (such as tR, tPROG, tBERS, etc.);