Design and enforce comprehensive IT security policies, zero-trust frameworks, and access controls in alignment with Malaysian PDPA regulations and global cybersecurity frameworks (e.g., ISO 27001, NIST).
To co-ordinate with PM, Project Executive (PE), Project Supervisor (PS) and Sub-Contractors on the progress of installation work in accordance to specific designs.
Conduct Factory Acceptance Testing (FAT), Site Acceptance Testing (SAT), User Acceptance Testing (UAT), and system acceptance testing to validate system performance
- Carry out detailed cycle time study for individual modules to select the appropriate machine or module design. Develop 3D model of the machine and/or modules assigned with optimised design for manufacturing, cost, quality and safety.