jobs in AG STAFFING

AG STAFFING Hiring! Full Time Commissioning - OFCI Engineers-Managers - Data Centre Construction - JB-KL in Johor, Earn up to MYR 18,000 - Ricebowl

Commissioning - OFCI Engineers-Managers - Data Centre Construction - JB-KL

Share
Save

Working Location

  • Johor Bahru Johor Malaysia

Job Description

Responsibilities

Client is an international PMC hiring for multiple vacancies for their data centre contruction projects in JB, Nusajaya, KL and Cyberjaya.

Commissioning & OFCI Engineers/Managers - Data Centre Construction - JB/KL

The role bridges the gap between equipment procurement and final facility handover, ensuring that major client-purchased systems—such as generators, switchgear, chillers, and UPS units—are properly delivered, installed, tested, and integrated into the building.

Core Responsibilities

The role combines two closely linked functions across the project lifecycle:

  • OFCI Package Management. You act as the primary liaison between the client’s procurement team, equipment manufacturers, and onsite contractors. This includes tracking manufacturing lead times, managing "just-in-time" site deliveries, and vetting technical submittals so equipment footprints and connection points match site designs.
  • Factory Testing & Quality Control. You schedule, coordinate, and often witness Factory Acceptance Tests (FAT) and Factory Witness Tests (FWT) to verify equipment meets specifications before it leaves the factory.
  • End-to-End Commissioning (Levels 0–5). You develop and drive the commissioning schedule from initial factory checks (Level 0) and site installation verification (Level 1–2) through to functional testing (Level 3–4) and Integrated Systems Testing (Level 5).
  • Safety & Permit Control. You manage Lockout/Tagout (LOTO) procedures, energization permits, and boundary controls as systems transition from construction to live power.
  • Handover & Documentation. You compile final turnover packages, including test scripts, red-line drawings, compliance certificates, and Operation & Maintenance (O&M) manuals, while coordinating client operator training.

Job Types: Full-time, Contract

Pay: RM10,000.00 - RM18,000.00 per month

Work Location: In person

Important Information

Never provide your bank or credit card details when applying for jobs. Do not transfer any money or complete unrelated online surveys. If you see something suspicious, Report this Job ad.

Learn More