jobs in AG Staffing

AG Staffing Hiring! Full Time Substation Site Inspector – Electrical (Data Centre Construction) JB in Johor, Earn up to MYR 8,000 - Ricebowl

Substation Site Inspector – Electrical (Data Centre Construction) JB

MYR8,000 - MYR8,000 Per Month
Share
Save

Working Location

  • Johor Bahru Johor Malaysia

Job Description

Responsibilities

JOB DESCRIPTION – SUBSTATION SITE INSPECTOR – ELECTRICAL (DATA CENTRE)

Department

Quality Assurance / Quality Control (QA/QC) / Construction Management

Reports To

Lead QA/QC Engineer / Resident Engineer / Construction Manager

Job Summary

The Substation Site Inspector – Electrical is responsible for supervising, inspecting, and auditing the installation, testing, and commissioning of high-voltage (HV) and medium-voltage (MV) electrical infrastructure for hyper-scale data centre projects. The role ensures that all substation works comply with approved designs, strict project quality plans, international reliability standards (e.g., Uptime Institute Tier III/IV), and local regulatory requirements. The inspector plays a critical role in minimizing installation defects that could impact the future operational uptime of the data centre.

Key Responsibilities

1. Site Inspection & Quality Control

· Daily Inspections: Conduct physical checks of all electrical installations, including power transformers, Gas-Insulated Switchgear (GIS), Air-Insulated Switchgear (AIS), earthing grids, lightning protection, and cabling.

· Compliance Verification: Verify that all equipment, materials, and workmanship comply with approved Issued-for-Construction (IFC) drawings, Method Statements, and Quality Control Plans (QCP).

· Asset Preservation: Monitor the storage, preservation, and handling of sensitive electrical equipment on-site to prevent environmental degradation prior to final installation.

· Defect Management: Issue Non-Conformance Reports (NCR) for defective materials or substandard installation practices, tracking corrective actions through to closure.

2. Testing & Commissioning Witnessing

· Witness SAT: Witness and verify all Site Acceptance Tests (SAT) and pre-commissioning tests, including insulation resistance (Megger), transformer winding resistance, turns ratio, Hi-Pot tests, CT/VT verification, and SF6 gas quality checks.

· Data Validation: Review, validate, and sign off on contractor test sheets, ensuring all results fall strictly within acceptable engineering tolerances.

· Tool Calibration: Ensure all engineering test instruments used by contractors are validly calibrated and certified by accredited laboratories.

3. Coordination & Interface Management

· Civil & Structural Liaison: Coordinate closely with C&S teams to verify that foundations, plinths, cable trenches, and containment pathways are ready for physical equipment positioning.

· MEP & PMS Integration: Collaborate with Mechanical, Electrical, and Plumbing teams regarding physical interfaces with building systems, backup generators, and Power Management Systems (PMS).

· Utility Coordination: Assist in the technical interface and site compliance handovers required by local utility representatives.

4. Documentation & Reporting

· Logs & Records: Maintain accurate daily and weekly site inspection logs, complete with progress photographs and quality verification records.

· As-Built Review: Review and verify "As-Built" drawings submitted by the contractor against the actual site installation layout.

· Handover Dossier: Compile, organize, and archive quality checklists and testing records required for final mechanical completion documentation.

5. Health, Safety, and Environment (HSE)

· HV Protocols: Enforce strict compliance with high-voltage electrical safety protocols, lock-out/tag-out (LOTO) procedures, and permit-to-work (PTW) systems.

· Hazard Mitigation: Identify and immediately report any unsafe site conditions, electrical hazards, or unauthorized live testing activities.

Core Competencies & Requirements

1. Education & Professional Credentials

· Academic Degree: Diploma or Bachelor’s Degree in Electrical Engineering from a recognized institution.

· BEM Registration: Registered with the Board of Engineers Malaysia (BEM) as an Engineering Technician or Graduate Engineer is highly preferred.

· Safety Passes: Valid CIDB Green Card and NIOSH Safety Passport are mandatory requirements.

2. Work Experience

· Industry Tenure: Minimum of 3 to 5+ years of direct site inspection or QA/QC experience in medium-voltage (MV) to high-voltage (HV) substation projects.

· GIS Specialization: Specific experience with Gas-Insulated Switchgear (GIS) installation and testing procedures is highly desirable.

· Critical Facilities: Prior experience working on fast-track infrastructure projects, critical infrastructure, or hyper-scale data centres is an advantage.

3. Technical Knowledge

· Drawing Literacy: Strong proficiency in reading and interpreting Single-Line Diagrams (SLD), schematic drawings, cable schedules, and termination layouts.

· Code Compliance: Solid understanding of international codes (IEC, IEEE) and local electrical utility guidelines.

· Redundancy Design: Familiarity with data centre reliability philosophies, including redundancy configurations and segregated cable pathways.

4. Soft Skills

· Objective Enforcement: Sharp eye for detail with a firm, objective approach to enforcing quality and safety compliance on-site.

· Bilingual Communication: Strong communication and technical report-writing skills in English and Bahasa Malaysia.

· Fast-Track Coordination: Ability to work effectively under tight project timelines and collaborate with multi-disciplinary contracting teams.

Job Types: Full-time, Contract

Pay: Up to RM8,000.00 per month

Work Location: In person

Important Information

Never provide your bank or credit card details when applying for jobs. Do not transfer any money or complete unrelated online surveys. If you see something suspicious, Report this Job ad.

Learn More