Mechanical Project Managers - Data Centre Construction - PMC - Johor Bahru
Key Responsibilities
1. Cooling Infrastructure & Technical Execution
- System Delivery: Oversee the installation of large-scale chilled water systems, including high-efficiency centrifugal chillers, cooling towers, Computer Room Air Handlers (CRAHs), and Computer Room Air Conditioning (CRAC) units.
- Liquid Cooling Transition: Drive the deployment of advanced cooling topologies for high-density AI clusters, including Direct-to-Chip (Liquid-to-Air / Liquid-to-Water) cooling, rear-door heat exchangers, and Coolant Distribution Units (CDUs).
- Piping & Containment: Manage the fabrication and installation of heavy-duty condenser and chilled water piping networks, valve matrices, and secondary containment loops.
2. Life Safety, Fire & Ventilation Systems
- BOMBA Integration: Lead the deployment of mission-critical gas suppression systems (e.g., Inergen, FM200, Novec 1230) and Pre-Action dry-pipe sprinkler systems, ensuring strict alignment with BOMBA requirements.
- Ventilation & Smoke Extraction: Supervise the installation of pressurization fans, smoke spill systems, and fuel oil supply/storage networks for backup diesel generators.
3. Procurement, Planning & Coordination
- Long-Lead Management: Track factory production, shipping logistics, and site delivery schedules for long-lead equipment (e.g., chillers, CRAHs, CDUs) to prevent critical path delays.
- BIM & Space Coordination: Utilize Building Information Modeling (BIM) to resolve complex spatial clashes between heavy piping, ductwork, electrical busducts, and cable trays before site installation.
- Subcontractor Management: Manage mechanical subcontractors, assess monthly progress claims, and evaluate variation orders (VOs).
Job Types: Full-time, Contract
Pay: RM12,000.00 - RM18,000.00 per month
Work Location: In person