jobs in AG STAFFING

AG STAFFING Hiring! Full Time MEP Project Manager (Data Centre Construction) - PMC - Johor Bahru in Johor, Earn up to MYR 18,000 - Ricebowl

MEP Project Manager (Data Centre Construction) - PMC - Johor Bahru

MYR12,000 - MYR18,000 Per Month
Share
Save

Working Location

  • Johor Bahru Johor Malaysia

Job Description

Responsibilities

MEP Project Manager (Data Centre Construction) - PMC - Johor Bahru

Key Responsibilities

1. Inter-Disciplinary MEP Integration

  • System Convergence: Oversee the seamless interface between heavy electrical loads (multi-megawatt UPS arrays, backup generators, MV switchgear) and heavy mechanical thermal systems (chilled water plants, CRAH units, liquid-to-chip CDUs).
  • BIM Spatial & Clash Management: Lead 3D Building Information Modeling (BIM) coordination reviews to proactively resolve spatial conflicts between large chilled-water pipes, electrical busduct tracks, and ELV cable containments.
  • Plumbing & Critical Drainage: Manage specialized technical plumbing infrastructure, including fuel oil piping loops for backup generators, condensation drainage arrays for data halls, and emergency domestic water storage backstops.

2. Long-Lead Procurement & Schedule Alignment

  • Critical Path Mitigation: Manage production, factory inspections, logistics, and site delivery dates for multi-million dollar long-lead machinery (e.g., chillers, cooling towers, continuous-duty generators, modular UPS blocks).
  • Work Package Master Scheduling: Construct and maintain detailed, integrated MEP construction programs using MS Project or Primavera P6, adapting to compressed fast-track hyperscale schedules.

3. 5-Level Commissioning Leadership

  • FAT/SAT Accountability: Approve and witness Factory Acceptance Testing (FAT) worldwide and Site Acceptance Testing (SAT) on-site.
  • Integrated Systems Testing (IST): Act as the ultimate technical authority steering Level 1 through Level 5 Commissioning. Direct the final "Black Building" load-bank simulations to prove that power failovers and thermal stability function automatically without losing any simulated IT server loads.

4. Statutory Approvals & Safety Enforcement

  • Utility & Authority Interface: Lead negotiations and coordinate compliance handovers with Tenaga Nasional Berhad (TNB) for EHV/HV grid hookups, Suruhanjaya Tenaga (ST), BOMBA (for fire systems integration), DOSH (for pressure vessels), and SPAN.
  • High-Risk Safety Protocols: Enforce rigorous Lock-Out, Tag-Out (LOTO) frameworks and High Voltage testing permits-to-work across all MEP subcontractors in alignment with CIDB guidelines.

Job Types: Full-time, Contract

Pay: RM12,000.00 - RM18,000.00 per month

Work Location: In person

Important Information

Never provide your bank or credit card details when applying for jobs. Do not transfer any money or complete unrelated online surveys. If you see something suspicious, Report this Job ad.

Learn More