- Gerbang Nusajaya Johor Malaysia
Working Location
Job Description
Responsibilities
Job Description: HVAC / Mechanical Engineer
Position Purpose
The HVAC / Mechanical Engineer is responsible for the massive cooling systems needed to keep servers from overheating. This role handles large-scale chilled water infrastructure and precision airflow systems.
Key Responsibilities
· Cooling Plant Installation: Supervise the installation of industrial chillers, cooling towers, CRAH/CRAC units, chilled water pipe networks, and pumps.
· Airflow Management: Ensure raised flooring, hot/cold aisle containment, and ductworks are tightly sealed and installed to specification.
· Pressure & Leak Testing: Oversee hydrostatic testing for chilled water piping and duct leakage testing protocols.
· System Balancing: Manage the Testing, Adjusting, and Balancing (TAB) of air and water systems to achieve optimal energy efficiency.
Job Types: Full-time, Contract
Pay: RM6,000.00 - RM12,000.00 per month
Work Location: In person
Important Information
Never provide your bank or credit card details when applying for jobs. Do not transfer any money or complete unrelated online surveys. If you see something suspicious, Report this Job ad.