jobs in AG STAFFING

AG STAFFING Hiring! Full Time HVAC - Mechanical Engineers (Data Centre Construction) JB in Johor, Earn up to MYR 12,000 - Ricebowl

HVAC - Mechanical Engineers (Data Centre Construction) JB

Share
Save

Working Location

  • Johor Bahru Johor Malaysia

Job Description

Responsibilities

Job Description: HVAC / Mechanical Engineer

Position Purpose

The HVAC / Mechanical Engineer is responsible for the massive cooling systems needed to keep servers from overheating. This role handles large-scale chilled water infrastructure and precision airflow systems.

Key Responsibilities

· Cooling Plant Installation: Supervise the installation of industrial chillers, cooling towers, CRAH/CRAC units, chilled water pipe networks, and pumps.

· Airflow Management: Ensure raised flooring, hot/cold aisle containment, and ductworks are tightly sealed and installed to specification.

· Pressure & Leak Testing: Oversee hydrostatic testing for chilled water piping and duct leakage testing protocols.

· System Balancing: Manage the Testing, Adjusting, and Balancing (TAB) of air and water systems to achieve optimal energy efficiency.

Job Types: Full-time, Contract

Pay: RM6,000.00 - RM12,000.00 per month

Work Location: In person

Important Information

Never provide your bank or credit card details when applying for jobs. Do not transfer any money or complete unrelated online surveys. If you see something suspicious, Report this Job ad.

Learn More