jobs in AG STAFFING

AG STAFFING Hiring! Full Time Architectural Project Managers - Data Centre Construction - PMC - Johor Bahru in Johor, Earn up to MYR 12,000 - Ricebowl

Architectural Project Managers - Data Centre Construction - PMC - Johor Bahru

MYR10,000 - MYR12,000 Per Month
Share
Save

Working Location

  • Johor Bahru Johor Malaysia

Job Description

Responsibilities

Architectural Project Managers - Data Centre Construction - PMC - Johor Bahru

Key Responsibilities

1. Building Envelope & Structural Fit-Out

  • Aesthetic & Functional Elements: Oversee the execution of external cladding, high-performance roofing systems, sandwich panel walls, raised floor installations, and specialized acoustic ceilings.
  • Structural Loading Coordination: Verify that architectural floor layouts can support ultra-heavy MEP equipment loads, including massive multi-megawatt backup generators, transformers, and high-density battery racks.
  • Spatial Integrity & Air Tightness: Ensure data halls achieve perfect air tightness and thermal insulation properties to minimize cooling leakage and meet strict Power Usage Effectiveness (PUE) requirements.

2. Physical Security, Fire Protection & Zoning

  • Security & Access Control Layouts: Design and implement architectural zoning configurations for physical security, including anti-tailgating turnstiles, mantraps, bullet-resistant partitions, and perimeter fencing.
  • BOMBA Fire Compartmentation: Ensure passive fire protection measures comply with the Uniform Building By-Laws (UBBL), managing fire-rated walls (up to 2 or 4 hours), blast relief dampers, and fire doors.

3. Coordination & Spatial Integration

  • BIM Spatial Control: Lead Building Information Modeling (BIM) coordination meetings to prevent spatial clashes between structural/architectural elements and complex mechanical ducting or electrical cable trays.
  • White Space / Data Hall Readiness: Manage the precise installation of heavy-duty ceiling grids (for structural containment drops), anti-static raised flooring, and hot/cold aisle containment structures.

4. Planning, Procurement & Compliance

  • Material Procurement: Track long-lead architectural materials (e.g., specialized fire-rated doors, certified raised floor tiles, acoustic panels) to prevent critical path delays.
  • Statutory Clearances: Coordinate with local municipal councils (PBT) and relevant bodies to secure the Certificate of Completion and Compliance (CCC).

Job Types: Full-time, Contract

Pay: RM10,000.00 - RM12,000.00 per month

Work Location: In person

Important Information

Never provide your bank or credit card details when applying for jobs. Do not transfer any money or complete unrelated online surveys. If you see something suspicious, Report this Job ad.

Learn More