Commissioning Managers - Data Centre Construction - PMC - Johor Bahru
Key Responsibilities
1. Master Commissioning Strategy & Plan Development
- Plan Ownership: Write, update, and implement the comprehensive Project Commissioning Plan, Scripts, and Matrix outlining testing methodologies for all MEP systems.
- Script Engineering: Author hyper-detailed, step-by-step testing procedures (scripts) for component, system, and integrated testing phases (including component isolation and failover sequences).
- BIM & System Tagging: Coordinate with the Building Information Modeling (BIM) and asset management teams to ensure every valve, breaker, sensor, and chiller is accurately logged, tagged, and tracked.
2. Execution of the 5 Levels of Commissioning
- Level 1 (Factory Acceptance Testing - FAT)
- Level 2 (Site Acceptance Testing - SAT)
- Level 3 (Pre-Functional Testing / PFT)
- Level 4 (Functional Performance Testing / FPT)
- Level 5 (Integrated Systems Testing / IST)
3. Vendor, Client & Authority Management
- Hyperscale Client Interfacing: Act as the direct site conduit to client engineering teams to validate and sign off on technical commissioning milestones.
- Regulatory Submissions: Support the appointed Suruhanjaya Tenaga (ST) Competent Engineers, BOMBA inspectors, and DOSH engineers during statutory validation runs, safety certifications, and energization handovers
Job Types: Full-time, Contract
Pay: RM12,000.00 - RM15,000.00 per month
Work Location: In person