Bills of Material (BOM) – exposure to preparation and reviewing the BOM of projects, detailing quantities and types of precast components and estimating raw materials required for precast production (concrete, steel reinforcement, welded mesh, cast-in items, etc.).
Material Consumption Analysis – assist in analyzing and monitoring actual material consumption versus approved shop drawings and BOM.
Production Wallchart Updating – perform updating of production wallchart to align factory teams with revised drawings and minimize errors and delays.
...
Engineering: 10+ years professional software engineering. Strong CS fundamentals. Strong TypeScript/JavaScript and Python. Extensive backend engineering. React/Next.js. Production-scale systems, distributed systems, databases, data-intensive applications, production deployment and operations.
AI / Agentic Systems: strong hands-on experience with several of — Claude/Anthropic, LLM APIs, agentic workflows, tool-using agents, function calling, multi-agent systems, agent memory, RAG, planning systems, reflection loops, evaluation frameworks, autonomous workflows, AI experimentation, LLM observability, prompt optimization, model routing.
We are particularly interested in engineers who have built these systems themselves, not engineers who have only read about them. You should be able to show us production AI systems, agents executing real tasks, complex tool-use workflows, autonomous or semi-autonomous systems, AI evaluation systems, self-improving workflows, and large-scale distributed systems.
...
Bills of Material (BOM) – exposure to preparation and reviewing the BOM of projects, detailing quantities and types of precast components and estimating raw materials required for precast production (concrete, steel reinforcement, welded mesh, cast-in items, etc.).
Material Consumption Analysis – assist in analyzing and monitoring actual material consumption versus approved shop drawings and BOM.
Production Wallchart Updating – perform updating of production wallchart to align factory teams with revised drawings and minimize errors and delays.
...