Lead structural design packages for data centre projects from AECOM Enterprise Capabilities in Kuala Lumpur. Deliver coordinated, buildable designs for Malaysian and global project teams, working with the Data Centre Design Manager, lead-office structural engineers and other discipline leads.
Responsibilities
- Design data centre frames, slabs, foundations, plant platforms and equipment supports using appropriate concrete, steel or precast solutions.
- Establish and verify load schedules for IT racks, batteries, transformers, generators, cooling plant and future equipment changes, including concentrated and dynamic loads.
- Assess deflection, vibration, movement and relevant wind or seismic actions. Coordinate structural criteria with equipment tolerances and operational requirements.
- Resolve openings, risers, plinths, equipment access and service supports with architecture and MEP teams. Incorporate geotechnical and specialist vendor inputs.
- Produce and check analysis, calculations, drawings and specifications. Coordinate structural models and manage design changes, technical queries and contractor submissions.
- Guide structural engineers and BIM staff, plan package delivery and checking, and develop practical solutions for construction sequencing and future expansion.
- Significant, recent structural design responsibility on hyperscale or colocation data centres, including detailed design. General building design experience alone is insufficient.
- Proven experience with high floor loads, critical equipment supports, multidisciplinary interfaces and serviceability decisions on data centre projects.
- Civil or structural engineering degree, proficiency with suitable structural analysis software and ability to review Revit-based structural deliverables.
- Ability to apply Malaysian or destination-country design requirements with the authorised project design team. Professional registration and Malaysian data centre experience are advantageous.
- Able to work from Kuala Lumpur, lead package delivery and communicate assumptions, design risks and checking outcomes clearly in English.
Project evidence
Summarise at least two recent data centre projects, including structural form, facility scale, design stages and your responsibility. Explain one equipment-loading, vibration, serviceability or major-opening decision and the checks that supported it.