100+份Mechanical Assembly 工作机会 - 最新工作招聘 - September 2026

显示143个工作的结果 "mechanical assembly"
不要错过任何 Mechanical Assembly 的新工作机会
SGD2,200 - SGD2,200 每月

Singapore

Posted
14 days ago
SGD3,000 - SGD3,000 每月

Singapore

Posted
15 days ago
SGD2,200 - SGD2,200 每月

Singapore

Posted
15 days ago
SGD2,150 - SGD2,800 每月

Serangoon

Posted
17 days ago
SGD2,500 - SGD3,000 每月

Jurong West

Posted
17 days ago
SGD2,200 - SGD2,200 每月

Singapore

Posted
19 days ago
SGD2,200 - SGD2,200 每月

Singapore

Posted
20 days ago
SGD2,200 - SGD2,200 每月

Singapore

Posted
21 days ago
SGD2,200 - SGD2,200 每月

Singapore

Posted
23 days ago
SGD2,200 - SGD2,200 每月

Singapore

Posted
24 days ago
Undisclosed
Posted
a month ago
SGD2,200 - SGD2,200 每月

Singapore

Posted
a month ago

Comet Plasma Control Technologies

Undisclosed

George Town

Posted
a month ago
SGD2,200 - SGD2,200 每月

Singapore

Posted
a month ago

Comet Plasma Control Technologies

Undisclosed

George Town

Posted
a month ago
Undisclosed

Singapore

Posted
a month ago
Undisclosed

Taman Dato Chellam

  • Requirements
  • Diploma or Degree in Mechanical Engineering, Manufacturing Engineering, Mechatronics, or a related discipline.
  • Proficient in CAD software 2D and 3D design work (e.g. SolidWorks, AutoCAD, FreeCAD etc) ...
Posted
2 days ago

Cisly Technologies Sdn Bhd

Undisclosed
  • Customer Requirement & Design Development: Communicate with customers and project stakeholders to understand application needs, specifications, constraints and expected outcomes. Translate requirements into design concepts and practical engineering solutions.
  • Mechanical Design & CAD Modelling: Create and revise 3D models, assemblies and 2D engineering drawings using SolidWorks and other CAD tools as required. Design components and systems with consideration for functionality, manufacturability, assembly, maintainability, material selection and cost-effectiveness.
  • BOM Management & Engineering Change Control: Prepare, monitor, maintain and update Bills of Materials (BOMs) to ensure part numbers, descriptions, quantities, materials and revisions are accurate. Coordinate design or component changes with purchasing, project, production and other relevant teams. ...
Posted
19 days ago