- Johor Bahru Johor Malaysia
工作地点
职位描述
岗位职责
Job Description: Fire Protection Engineer
Position Purpose
The Fire Protection Engineer designs and supervises systems that detect and put out fires without destroying sensitive electronic hardware. They ensure the building complies with strict life-safety laws.
Key Responsibilities
· Specialized Suppression: Oversee the installation of data centre-specific fire systems, including Pre-Action sprinklers and Gas Suppression Systems (e.g., FM-200, Novec 1230, or Inert gas).
· Early Detection: Supervise the deployment of VESDA (Very Early Smoke Detection Apparatus) and regular smoke detector networks.
· Bomba Clearance: Manage room integrity testing (door fan tests) for gas rooms and lead inspections to secure the Certificate of Completion and Compliance (CCC) from Jabatan Bomba dan Penyelamat.
· Life Safety Integration: Ensure fire alarm systems smoothly trigger fire doors, access control overrides, and HVAC shutdowns during emergencies.
Job Types: Full-time, Contract
Pay: RM6,000.00 - RM12,000.00 per month
Work Location: In person
重要安全守则
申请工作时,切勿提供您的银行或信用卡详细资料。不要转账或完成无关的在线调查问卷。如果您发现可疑内容,请举报此招聘广告。