Develop construction methods, work sequences, and execution strategies in accordance with approved drawings and specifications.
Prepare construction schedules, resource plans, manpower deployment, and equipment requirements.
Coordinate daily, weekly, and monthly construction activities.
Monitor progress against project milestones and implement recovery plans for delays.
Ensure construction activities comply with contractual requirements, approved method statements, and inspection and test plans (ITPs).
Oversee TBM excavation activities, including EPB, slurry, or hard-rock TBM operations, as applicable.
Coordinate TBM launch, tunneling advance, breakthrough, and retrieval activities.
Monitor TBM performance indicators, including advance rate, penetration rate, thrust force, torque, cutterhead pressure, and stoppages.
Ensure proper coordination of segment erection, tail-void grouting, muck removal, and tunnel logistics.
Monitor ground conditions, face pressure, settlement, groundwater inflow, and potential risks during excavation.
Coordinate TBM maintenance, cutter changes, consumables, and critical spare parts with the TBM team.
Supervise excavation sequences, including top heading, bench, and invert construction, where applicable.
Ensure timely installation of initial support, such as shotcrete, rock bolts, steel ribs, lattice girders, and wire mesh.
Review geological conditions, rock mass classifications, and tunnel face mapping with the engineering and geotechnical teams.
Ensure excavation rounds, support installation, and monitoring comply with the approved excavation and support design.
Coordinate probe drilling, pre-grouting, dewatering, and water-ingress control measures where required.
Manage precast segment installation and quality control for TBM-driven tunnels.
Supervise secondary lining, waterproofing membranes, reinforcement, formwork, and concrete placement.
Coordinate invert slabs, cross passages, adits, shafts, portals, and underground structures.
Ensure concrete quality, segment tolerances, gasket installation, bolt tightening, and watertightness requirements are met.
Coordinate civil, mechanical, electrical, ventilation, drainage, and fire-life-safety interfaces.
Implement the project safety management plan and ensure compliance with applicable legislation and client requirements.
Conduct site inspections, toolbox meetings, safety briefings, and risk assessments.
Ensure permits to work, confined-space controls, gas monitoring, ventilation, and emergency arrangements are in place.
Control risks associated with underground work, including fire, flooding, ground collapse, hazardous atmospheres, and equipment movement.
Investigate incidents and near misses, implement corrective actions, and monitor closure.
Manage noise, dust, slurry, groundwater discharge, spoil disposal, and other environmental impacts.
Ensure construction work complies with approved drawings, specifications, ITPs, and quality procedures.
Coordinate inspections, material testing, concrete testing, segment inspections, and survey checks.
Review non-conformance reports (NCRs), corrective actions, and preventive measures.
Ensure accurate records of excavation, support installation, grouting, lining, and as-built information.
Coordinate inspections and approvals with the consultant, resident engineer, client, and relevant authorities.
Coordinate monitoring of surface settlement, buildings, utilities, groundwater, and tunnel convergence.
Review instrumentation data, including settlement markers, inclinometers, piezometers, and convergence points, as applicable.
Ensure monitoring trigger levels and action plans are implemented.
Coordinate immediate responses when monitoring results exceed alert or action limits.
Work with geotechnical engineers to assess ground conditions and implement mitigation measures, including grouting or changes to excavation procedures.
Plan manpower requirements for engineers, supervisors, surveyors, operators, and skilled workers.
Allocate plant and equipment according to construction priorities.
Coordinate shift work and 24-hour tunneling operations, including shift handovers.
Monitor labor productivity, equipment utilization, and material consumption.
Resolve manpower shortages, equipment breakdowns, and logistical constraints.
Monitor construction expenditure against the approved budget.
Track productivity, quantities completed, material consumption, and subcontractor performance.
Identify potential variations, additional works, and delay-related costs.
Coordinate with the commercial and quantity surveying teams on progress claims, variations, and extension-of-time submissions.
Minimize waste, rework, unnecessary stoppages, and inefficient resource utilization.
Lead coordination meetings with project engineers, site supervisors, subcontractors, consultants, and the client.
Coordinate interfaces between tunneling, shafts, stations, utilities, and associated civil works.
Resolve technical and construction issues and escalate critical risks promptly.
Coordinate permits, inspections, traffic management, utility protection, and authority requirements.
Maintain effective communication between site teams, design teams, project management, and head office.
Prepare daily, weekly, and monthly construction progress reports.
Track tunnel advance, excavation quantities, lining completion, labor productivity, and equipment downtime.
Maintain records of TBM performance, geological conditions, stoppages, and ground movement.
Report construction risks, delays, mitigation measures, and forecast completion dates.
Maintain accurate site diaries, progress photographs, inspection records, and handover documentation.