jobs in AG STAFFING

全职 Fire Protection Engineers (Data Centre Construction) JB 工作, 薪水 up to MYR 12,000, AG STAFFING Johor 公司招聘中 - Ricebowl

Fire Protection Engineers (Data Centre Construction) JB

Gerbang Nusajaya, Johor

分享
保存

工作地点

  • Gerbang Nusajaya Johor Malaysia

职位描述

岗位职责

Job Description: Fire Protection Engineer

Position Purpose

The Fire Protection Engineer designs and supervises systems that detect and put out fires without destroying sensitive electronic hardware. They ensure the building complies with strict life-safety laws.

Key Responsibilities

· Specialized Suppression: Oversee the installation of data centre-specific fire systems, including Pre-Action sprinklers and Gas Suppression Systems (e.g., FM-200, Novec 1230, or Inert gas).

· Early Detection: Supervise the deployment of VESDA (Very Early Smoke Detection Apparatus) and regular smoke detector networks.

· Bomba Clearance: Manage room integrity testing (door fan tests) for gas rooms and lead inspections to secure the Certificate of Completion and Compliance (CCC) from Jabatan Bomba dan Penyelamat.

· Life Safety Integration: Ensure fire alarm systems smoothly trigger fire doors, access control overrides, and HVAC shutdowns during emergencies.

Job Types: Full-time, Contract

Pay: RM6,000.00 - RM12,000.00 per month

Work Location: In person

重要安全守则

申请工作时,切勿提供您的银行或信用卡详细资料。不要转账或完成无关的在线调查问卷。如果您发现可疑内容,请举报此招聘广告。

了解更多