jobs in Specific Dimension Sdn Bhd

全职 Project Engineer (HVAC) 工作, 薪水 up to MYR 5,999, Specific Dimension Kedah 公司招聘中 - Ricebowl

Project Engineer (HVAC) jobs

Project Engineer (HVAC)

MYR3,000 - MYR5,999 每月
Fresh Graduates
最后机会申请此工作。
Posted 15 minutes ago • Closing 13 Mar 2027
最后机会申请此工作。
分享
保存

工作地点

  • Kampung Padang Kulim Kulim Kedah Malaysia 09000

职位描述

任职资格

  • Degree in Mechanical Engineering

  • At least 1-2 years above of HVAC & ACMV installation experience, welcome fresh graduate candidate.

  • Strong leadership, coordination and communication skills.

  • Able to be travelling.

岗位职责

Job Description

1. Overall Tasks / Scopes

  • To ensure project execution in proper and clear direction on each step to complete the project in term of quality, schedule and hand over.

2. Site Execution & Schedule Control

  • Understand and manage daily site progress against the master construction program

  • Coordinate site access, manpower, tools, and material delivery for subcontractors and direct labor.

3. Technical Coordination & Drawing Management

  • Resolve design clashes and coordinate shop drawings between different trades and work with BIM drafter to solve this before bringing to site for installation.

  • Raise Requests for Information (RFIs) to the consultant/client when design discrepancies arise on-site.

  • Liaise with Main Contractor, Consultant, and Client on quality matters

4. Daily Supervision & Labor Management

  • Directly supervise sub-contractors, supervisors, foremen, and direct labor on the site floor.

  • Assign daily targets to installation teams

  • Monitor daily manpower headcount and track labor productivity against targeted progress. Include taking attendance by company apps

  • Conduct daily Toolbox Talks (TBT) with the workforce before starting work, emphasizing risks specific to that day’s tasks (e.g., working at heights or confined space entry).

5. Front-Line Field Troubleshooting

  • Interpret shop drawings, construction drawings and BIM for the installation crews.

  • Solve immediate site clashes or installation constraints on the spot. Report out obstruction and delay by others field report by using company apps

6. Material Logistics & Tooling at the Workface

  • Coordinate the daily shifting of materials from the central site store to the specific installation floors.

  • Ensure installation teams have the correct tools, scaffolding, and consumables (welding rods, brackets, fasteners) before work starts to eliminate idle time.

7. Progress Documentation

  • Maintain the Daily Site Diary/Log, documenting completed work quantities and delays by using company apps for reporting, field report, work platform and scheduling, workers attendance, obstruction reports apps, delay field report

  • Take progress photographs to serve as evidence for monthly claims and record-keeping by using field report apps.

8. Quality Planning & Documentation

  • Prepare Project Quality Plan (PQP) for construction and HVAC works.

  • Develop Inspection & Test Plans (ITP) for ducting, piping, insulation, equipment installation, and testing & commissioning.

  • Review HVAC shop drawings, material submittals, method statements, and technical specifications.

  • Ensure compliance with contract requirements, consultant specifications, and local authority standards.

  • Maintain QA/QC documentation including checklists, inspection reports, test reports, and material approvals.

9. Material Inspection & Control

  • Conduct incoming material inspections.

  • Verify materials comply with approved submittals.

  • Ensure proper storage and handling of HVAC materials at site

  • Inspect materials for transit damage and ensure proper on-site storage conditions (e.g., proper capping and elevation of chilled water pipes).

10. Progress Quality Monitoring

  • Monitor HVAC installation works

  • Ensure proper supports, hangers, and vibration isolators are installed.

  • Verify slope, clearance, and routing comply with approved drawings

  • Conduct daily site inspection and prepare reports

11. Site Inspections & Testing Witnessing:

  • Issue and execute Work Inspection Requests (WIR) and Material Inspection Requests (MIR).

  • Witness critical static tests, including hydrostatic pressure testing for chilled water pipework, duct leakage testing (DW/143 or SMACNA), and weld non-destructive testing (NDT/Radiography).

12. Non-Conformance Management

  • Identify site deviations, issue Non-Conformance Reports (NCRs), and track corrective and preventive actions (CAPA) to closure.

  • Manage the project Punch List (Snag List) during the closing phases of construction.

13. Meeting

  • Prepare documents for inspection by authorities (if required)

  • Support consultant inspections and site walk-through

  • Attend Project Meeting, Schedule, QA/QC, commissioning meetings and other related meetings and report out daily field report by company apps.

14. Commissioning Planning & Strategy

  • Develop the Commissioning Plan, testing scripts, and sequential checklists (Pre-commissioning, Functional, and Performance testing).

  • Coordinate the lockout-tagout (LOTO) and energization schedules with the site team.

15. Pre-Commissioning (Static Verification)

  • Conduct visual inspections to ensure equipment is ready for power (e.g., checking fan rotation, pump alignment, cleanliness of water loops/flushing completion).

  • Verify that static testing (by QA/QC) is 100% complete with T&C forms

16. Testing and commissioning

  • Witness pressure testing for refrigerant and chilled water piping

  • Ensure flushing and chemical cleaning of chilled water system

  • Witness air balancing and water balancing

  • Ensure control system and thermostat calibration

17. Functional Performance Testing (Dynamic Verification):

  • PFT (Pre-Functional Testing): Verifying that the HVAC equipment is energized, fans rotate the right way, and sensors are calibrated.

  • Execute functional tests on equipment: chillers, Air Handling Units (AHUs), pumps, and variable speed drives (VSDs).

  • Witness and log Testing, Adjusting, and Balancing (TAB) for air and water systems.

  • Test integrated system operations, specifically BMS (Building -Management System) controls, interlocks, cause-and-effect matrices, and emergency fail-safes (e.g., fire alarm shutdowns).

18. Handover & Integrated Systems Testing (IST)

  • Lead the Integrated Systems Test / Black Start testing (critical for data centers or high-spec facilities).

  • Compile the final Commissioning Report and oversee the training of the client’s operations and maintenance (O&M) team.

  • Prepare and compile T&C reports for submission

19. Hand Over Docs

  • Compile as-built drawings for HVAC system

  • Prepare O&M manual submission

  • Ensure warranty documents and material certificates are complete

  • Support project handover and final inspection

  • Organized and execute classroom training to client and related parties

20. Client, Consultant & Stakeholder Management Prepare and present reports, updates, technical clarifications if request by management

  • Manage client expectations on timeline, cost, quality

  • Act as main point of contact for clients and consultants if request by management.

  • Resolve disputes and maintain professional relationships

21. General & Common Tasks

  • Compulsory to assist workers to take daily attendance.

  • Compulsory to fetch workers to the site if required by Management.

  • Coordinate and assist the HR Department with matters. (Regarding: hostel and worker issues.

  • Any others related job assign by superior.

好处

  • EPF
  • SOCSO
  • Annual Leave
  • Medical Leave
  • Health Insurance

重要安全守则

申请工作时,切勿提供您的银行或信用卡详细资料。不要转账或完成无关的在线调查问卷。如果您发现可疑内容,请举报此招聘广告。

了解更多