- Johor Bahru Johor Malaysia
工作地点
职位描述
岗位职责
Job Description: HVAC / Mechanical Engineer
Position Purpose
The HVAC / Mechanical Engineer is responsible for the massive cooling systems needed to keep servers from overheating. This role handles large-scale chilled water infrastructure and precision airflow systems.
Key Responsibilities
· Cooling Plant Installation: Supervise the installation of industrial chillers, cooling towers, CRAH/CRAC units, chilled water pipe networks, and pumps.
· Airflow Management: Ensure raised flooring, hot/cold aisle containment, and ductworks are tightly sealed and installed to specification.
· Pressure & Leak Testing: Oversee hydrostatic testing for chilled water piping and duct leakage testing protocols.
· System Balancing: Manage the Testing, Adjusting, and Balancing (TAB) of air and water systems to achieve optimal energy efficiency.
Job Types: Full-time, Contract
Pay: RM6,000.00 - RM12,000.00 per month
Work Location: In person
重要安全守则
申请工作时,切勿提供您的银行或信用卡详细资料。不要转账或完成无关的在线调查问卷。如果您发现可疑内容,请举报此招聘广告。