Site Engineers- Civil & Structural (Data Centre Construction) - Johor Bahru - 3 Vacancies (Construction Multinational)
Key Responsibilities
The Civil & Structural (C&S) Site Engineer in Data Centre Construction supervises on-site execution, ensuring highly specialized, mission-critical facilities are built to exact structural and architectural specifications. They bridge the gap between design and physical delivery, managing heavy-load specifications, vibration control, and strict quality and safety compliance.
Core Responsibilities
- Site Supervision & Coordination: Manage day-to-day on-site C&S activities, overseeing main contractors and subcontractors. Coordinate Civil, Structural, Architectural (CSA) works with Mechanical, Electrical, and Plumbing (MEP) disciplines.
- Quality & Compliance Control: Ensure all structural works are constructed per approved drawings and standards.
- Safety Management (HSE): Enforce strict safety protocols, enforce personal protective equipment (PPE) rules, conduct risk assessments, and maintain zero-incident site environments.
Preferences:
- Degree or diploma in Civil Engineering, Construction Management or related discipline.
- At least 5 years of relevant C&S site engineering/construction management/project management experience in construction projects.
- Able to manage daily site works, manpower, subcontractors, materials and work progress.
- Able to read drawings, coordinate technical issues and ensure works are carried out according to approved drawings, method statements and safety requirements.
- Experience in data centre, industrial, infrastructure, bridge, or building projects will be preferred.
- Good communication skills.
Pay: RM4,000.00 - RM8,000.00 per month
Work Location: In person