jobs in AG STAFFING

全职 Electrical Project Managers - Data Centre Construction - JB-KL 工作, 薪水 up to MYR 20,000, AG STAFFING Federal Territory 公司招聘中 - Ricebowl

Electrical Project Managers - Data Centre Construction - JB-KL

KL City, Federal Territory

分享
保存

工作地点

  • Kuala Lumpur Federal Territory Malaysia

职位描述

岗位职责

Client is an international PMC hiring for multiple vacancies for their data centre contruction projects in JB, Nusajaya, KL and Cyberjaya.

Electrical Project Managers - Data Centre Construction - JB/KL

Key Responsibilities

1. Technical Execution & Engineering Oversight

  • System Delivery: Oversee the installation of 132kV/33kV sub-stations, MV/LV switchgear, step-down transformers, UPS systems (2N/N+1), backup diesel generators, busduct tracks, and specialized clean earthing systems.
  • Design Review: Evaluate Single-Line Diagrams (SLDs), shop drawings, containment layouts, and engineering calculations to resolve technical clashes before construction begins.
  • Cooling Integration: Coordinate power distribution modifications required for high-density IT racks, including transition paths from traditional air cooling to liquid/direct-to-chip cooling architectures.

2. Project Planning & Procurement

  • Schedule Management: Develop and manage detailed electrical work packages, tracking milestones via MS Project or Primavera P6 to hit strict Ready-for-Service (RFS) deadlines.
  • Long-Lead Tracking: Monitor the manufacturing and delivery of long-lead equipment (e.g., UPS, generators, transformers) to prevent critical path site delays.
  • Subcontractor Management: Supervise electrical subcontractors, evaluate progress claims, and manage variation orders (VOs) alongside the commercial team.

3. Regulatory Compliance, Quality & Safety

  • Utility Coordination: Liaise with Tenaga Nasional Berhad (TNB) and Suruhanjaya Tenaga (ST) for grid interconnection, testing approvals, and energization clearance.
  • Statutory Submissions: Work closely with the appointed ST-certified Competent Electrical Engineer to secure legal sign-offs, including Form G and Form H approvals.
  • Site Safety: Enforce strict Lock-Out, Tag-Out (LOTO) systems, High Voltage testing permits, and risk assessment strategies (RAMS) in compliance with CIDB and DOSH guidelines.

Job Types: Full-time, Contract

Pay: RM12,000.00 - RM20,000.00 per month

Work Location: In person

重要安全守则

申请工作时,切勿提供您的银行或信用卡详细资料。不要转账或完成无关的在线调查问卷。如果您发现可疑内容,请举报此招聘广告。

了解更多