jobs in AG STAFFING

全职 MEP Design - BIM Coordination Engineers-Managers - Data Centre Construction - JB-KL 工作, 薪水 up to MYR 18,000, AG STAFFING Johor 公司招聘中 - Ricebowl

MEP Design - BIM Coordination Engineers-Managers - Data Centre Construction - JB-KL

分享
保存

工作地点

  • Johor Bahru Johor Malaysia

职位描述

岗位职责

Client is an international PMC hiring for multiple vacancies for their data centre contruction projects in JB, Nusajaya, KL and Cyberjaya.

MEP Design & BIM Coordination Engineers/Managers - Data Centre Construction - JB/KL

An MEP Design Manager in data centre construction leads the design, engineering, and coordination of critical mechanical, electrical, and plumbing systems from concept to commissioning. They ensure technical accuracy, budget adherence, and compliance with high-uptime standards, acting as the technical authority for complex infrastructure.

Key Responsibilities and Skills:

  • Design Oversight: Directs all MEP design phases, including detailed design and shop drawings.
  • Technical Expertise: Provides expertise in critical facility infrastructure (power, cooling, fire protection).
  • Coordination: Ensures seamless integration of MEP systems with structural and architectural elements.
  • Project Management: Manages design schedules, budgets, risk, and value engineering.
  • Collaboration: Liaises with clients, consultants, and contractors to ensure design intent aligns with construction.
  • Quality & Safety: Ensures installations meet strict quality standards and safety regulations

Preferences:

  • Experience: Requires 8–10+ years in MEP project delivery, specializing in mission-critical data centers.
  • Education: Bachelor’s degree in Electrical or Mechanical Engineering.

Job Types: Full-time, Contract

Pay: RM12,000.00 - RM18,000.00 per month

Work Location: In person

重要安全守则

申请工作时,切勿提供您的银行或信用卡详细资料。不要转账或完成无关的在线调查问卷。如果您发现可疑内容,请举报此招聘广告。

了解更多