Visit customer sites (such as large factories, commercial complexes, star-rated hotels, etc.) to conduct on-site research, assess the status of central air conditioning systems (including main units, chilled water pumps, cooling water pumps, cooling towers, end devices, etc.), daily operation management, etc.;
Research the existing BA automation system architecture and operation logic, analyze the hardware devices required for data collection and remote control, and the data interface requirements for integration with BA systems;
Based on the customer's site conditions and technical documentation, create an energy-saving transformation plan that aligns with company products, including equipment selection, operational strategies, and energy-saving benefit estimation;
As the technical lead, follow up on the entire energy-saving project process, including construction drawing handover, on-site guidance, and system debugging;
Maintain good communication with customers (e.g., equipment department, energy managers, chief engineers) to ensure smooth project implementation and acceptance;
Write related project documentation, build the company's technical knowledge base, and create a reusable industry case library.
Job Requirements:
Bachelor's degree or above in HVAC, building environment and equipment engineering, energy and power engineering, or related fields;
Proficient in the design and commissioning of HVAC systems (chillers, pumps, end devices, etc.);
Familiar with BA automation control systems for HVAC, including various data collection instruments. Able to identify problems in customer HVAC systems and propose improvement suggestions;
Familiar with mainstream energy-saving technologies such as start/stop control, frequency control, and system optimization scheduling. Create technically feasible and economically reasonable energy-saving transformation plans based on customer site conditions;
Experience in design institutes or large factory HVAC system management, or experience in energy-saving transformation projects for high-efficiency machine rooms is preferred.