jobs in SEARCH INDEX PTE. LTD.

全职 QA-QC Manager [Data Center Construction]- Upto $10K basic-VB- 5days- A1 Main Contractor- East area 工作, 薪水 up to SGD 7,000, SEARCH INDEX PTE. LTD. Islandwide (Singapore) 公司招聘中 - Ricebowl

QA-QC Manager [Data Center Construction]- Upto $10K basic-VB- 5days- A1 Main Contractor- East area

SEARCH INDEX PTE. LTD.

Islandwide (Singapore)

分享
保存

工作地点

  • Islandwide (Singapore) Singapore

职位描述

岗位职责

  • Up to $10,000 Basic + Variable bonus
  • Permanent position, New Data Center project at East area
  • Experience in constructing Data Center projects preferred.
  • Familiar with data centre construction quality requirements, testing and commissioning procedures, and relevant standards including ISO 9001, ANSI/TIA-942, ASHRAE thermal guidelines, Uptime Institute Tier principles, ASTM, ANSI, ACI, Singapore Standards and applicable Codes of Practice will be advantageous.
  • Having ISO 9001 Auditor certification, TIA-942, Uptime Institute, commissioning, Green Mark or other relevant data centre certifications will be advantageous.
  • MNC & Leading A1 Main Contractor!

Job Responsibilities:

  1. Experience in constructing Data Center projects preferred.
  2. Familiar with data centre construction quality requirements, testing and commissioning procedures, and relevant standards including ISO 9001, ANSI/TIA-942, ASHRAE thermal guidelines, Uptime Institute Tier principles, ASTM, ANSI, ACI, Singapore Standards and applicable Codes of Practice will be advantageous.
  3. Having ISO 9001 Auditor certification, TIA-942, Uptime Institute, commissioning, Green Mark or other relevant data centre certifications will be advantageous.
  • Lead the project’s QA/QC programme and ensure all works meet contract, drawing and specification requirements.
  • Develop and maintain the Project Quality Plan, inspection checklists, quality procedures and reporting system.
  • Review construction documents, material submissions and inspection records for completeness and compliance.
  • Conduct and coordinate site inspections for civil, architectural and M&E works.
  • Ensure subcontractors understand quality requirements before starting work.
  • Monitor materials, equipment and workmanship delivered to site.
  • Manage defects, non-conformance reports, punch lists and corrective actions through closure.
  • Chair regular quality meetings and track outstanding issues.
  • Supervise QA/QC inspectors and verify that quality documentation is properly maintained.
  • Work closely with the project team, consultants, subcontractors and client representatives.
  • Identify quality risks early and implement preventive or corrective measures.
  • Drive continuous improvement throughout construction and handover.

Job Requirements:

  • Diploma/ Degree in Civil Engineering or other related discipline.

Other Information: Please submit your resume with the following details:

  • Reason for leaving each past & current employment
  • Salary drawn for each past & current employment
  • Expected Salary
  • Earliest availability date

We regret only shortlisted candidates will be notified.

Lionel Cheow

EA License | 14C7092

EA Registration Number | R1105005

重要安全守则

申请工作时,切勿提供您的银行或信用卡详细资料。不要转账或完成无关的在线调查问卷。如果您发现可疑内容,请举报此招聘广告。

了解更多