

CTCI CMCE JV SDN. BHD
51-200 Employees · Construction / Building ·
CTCI CMCE JV SDN. BHD 简介
CTCI CMCE JV Sdn Bhd (hereinafter referred to as CCJV) was established on 10 July 2017 as a joint venture company formed with a smart partnership between CTCI Corporation and CMC Engineering Sdn Bhd. The CCJV main office is located at Level 7, Wisma MIE, No. 2, Jalan Industri PBP 2, Taman Industri Pusat Bandar Puchong, *7160 Puchong, Selangor.
CTCI CMCE JV Sdn Bhd will provide the design, manufacturer, supply, delivery, installation, testing and commissioning of the system works package for construction and completion of the Light Rail Transit Line 3 (LRT 3) from Bandar Utama to Johan Setia. The part of CTCI CMCE JV Sdn Bhd contract worth RM 616 million is covers power supply package specific for the Power Supply and Distribution System (PS&DS) for double track alignment with a total length 37.6 km, depot and 26 stations including 5 stations that integrate with existing and future public transport system. The completion period for The Light Rail Transit Line 3 (LRT 3) under Power Supply and Distribution System (PS&DS) work package is 44 months including testing and commissioning.
CTCI CMCE JV SDN. BHD 相册
CTCI CMCE JV SDN. BHD 公司信息
公司名称
CTCI CMCE JV SDN. BHD
公司类型
-
公司规模
51-200
领域
Construction / Building
公司SSM号码
1238179-M
就业机会
0
有问题想问这家公司?让雇主来回答吧!
CTCI CMCE JV SDN. BHD 地址
Wisma MIE, No. 2, Jalan Industri PBP 2, Taman Industri Puchong, Puchong, Selangor, Malaysia
