jobs in AG STAFFING

全职 Mechanical Project Managers - Data Centre Construction - PMC - Johor Bahru 工作, 薪水 up to MYR 18,000, AG STAFFING Johor 公司招聘中 - Ricebowl

Mechanical Project Managers - Data Centre Construction - PMC - Johor Bahru

MYR12,000 - MYR18,000 每月
分享
保存

工作地点

  • Johor Bahru Johor Malaysia

职位描述

岗位职责

Mechanical Project Managers - Data Centre Construction - PMC - Johor Bahru

Key Responsibilities

1. Cooling Infrastructure & Technical Execution

  • System Delivery: Oversee the installation of large-scale chilled water systems, including high-efficiency centrifugal chillers, cooling towers, Computer Room Air Handlers (CRAHs), and Computer Room Air Conditioning (CRAC) units.
  • Liquid Cooling Transition: Drive the deployment of advanced cooling topologies for high-density AI clusters, including Direct-to-Chip (Liquid-to-Air / Liquid-to-Water) cooling, rear-door heat exchangers, and Coolant Distribution Units (CDUs).
  • Piping & Containment: Manage the fabrication and installation of heavy-duty condenser and chilled water piping networks, valve matrices, and secondary containment loops.

2. Life Safety, Fire & Ventilation Systems

  • BOMBA Integration: Lead the deployment of mission-critical gas suppression systems (e.g., Inergen, FM200, Novec 1230) and Pre-Action dry-pipe sprinkler systems, ensuring strict alignment with BOMBA requirements.
  • Ventilation & Smoke Extraction: Supervise the installation of pressurization fans, smoke spill systems, and fuel oil supply/storage networks for backup diesel generators.

3. Procurement, Planning & Coordination

  • Long-Lead Management: Track factory production, shipping logistics, and site delivery schedules for long-lead equipment (e.g., chillers, CRAHs, CDUs) to prevent critical path delays.
  • BIM & Space Coordination: Utilize Building Information Modeling (BIM) to resolve complex spatial clashes between heavy piping, ductwork, electrical busducts, and cable trays before site installation.
  • Subcontractor Management: Manage mechanical subcontractors, assess monthly progress claims, and evaluate variation orders (VOs).

Job Types: Full-time, Contract

Pay: RM12,000.00 - RM18,000.00 per month

Work Location: In person

重要安全守则

申请工作时,切勿提供您的银行或信用卡详细资料。不要转账或完成无关的在线调查问卷。如果您发现可疑内容,请举报此招聘广告。

了解更多