- Johor Bahru Johor Malaysia
工作地点
职位描述
岗位职责
Job Description: ELV / BMS / ICT Engineers
Position Purpose
The ELV/BMS/ICT Engineer builds the control systems, security features, and network backbone of the facility. This role ensures the data centre can be monitored and operated safely in real-time.
Key Responsibilities
· BMS & Controls: Supervise the installation of Building Management Systems (BMS), SCADA, and Environmental Monitoring Systems (EMS) to track temperatures and power usage.
· Network Infrastructure: Manage the installation of structured cabling, including pathways, containment, and termination of high-strand fibre optic and copper cables.
· Security Systems: Oversee physical security infrastructure, including biometric access control, turnstiles, and CCTV cameras.
· Integration Testing: Test the software communication links (Modbus, BACnet, SNMP) between MEP hardware and the central control room.
Job Types: Full-time, Contract
Pay: RM6,000.00 - RM12,000.00 per month
Work Location: In person
重要安全守则
申请工作时,切勿提供您的银行或信用卡详细资料。不要转账或完成无关的在线调查问卷。如果您发现可疑内容,请举报此招聘广告。