jobs in AG STAFFING

全职 MEP Engineers (Data Centre Construction) JB 工作, 薪水 up to MYR 12,000, AG STAFFING Johor 公司招聘中 - Ricebowl

MEP Engineers (Data Centre Construction) JB

分享
保存

工作地点

  • Pasir Gudang Johor Malaysia

职位描述

岗位职责

Job Description: MEP Engineer

Position Purpose

The MEP Engineer coordinates the installation, testing, and balancing of all Mechanical, Electrical, and Plumbing systems. This role bridges the gap between different engineering disciplines, ensuring that power, cooling, and water infrastructure integrate perfectly into the building design.

Key Responsibilities

· Site Coordination: Oversee and coordinate day-to-day installation activities for all MEP trades on the construction floor.

· Progress Tracking: Monitor subcontractor performance against the master construction schedule to prevent delays.

· Design Review: Cross-check structural, architectural, and MEP drawings to identify and resolve spatial clashes before installation using digital models.

· Testing & Commissioning (T&C): Assist the commissioning agent during the critical Level 1 to Level 5 data centre commissioning phases.

· Problem Solving: Resolve technical engineering issues and coordinate requests for information (RFIs) between site teams, clients, and consultants.

Job Types: Full-time, Contract

Pay: RM6,000.00 - RM12,000.00 per month

Work Location: In person

重要安全守则

申请工作时,切勿提供您的银行或信用卡详细资料。不要转账或完成无关的在线调查问卷。如果您发现可疑内容,请举报此招聘广告。

了解更多