jobs in Principle Perspective Engineering

Principle Perspective Engineering Hiring! Full Time Construction Scheduler in WP Kuala Lumpur - Ricebowl

Share
Save

Working Location

  • Kuala Lumpur, Kuala Lumpur Kuala Lumpur WP Kuala Lumpur Malaysia

Job Description

Responsibilities

About the role

As the Construction Scheduler at PPE, you own the programme from the first line of logic to project close-out. You are not a reporter of progress — you are the person who drives it. Your schedule is the single source of truth for every project team member, subcontractor, and client.

Key responsibilities

  • Develop the construction method statement covering sequencing, phasing, access, logistics, lifting, and CSA/M&E interfaces before the schedule is drafted

  • Build the CPM baseline schedule in Primavera P6 or MS Project, structured by WBS with all logic ties, milestones, agreed buffers, and float management in place

  • Present and obtain sign-off on the baseline programme before construction mobilises

  • Manage all changes to the baseline through a proper revision and approval process

  • Publish 2-week and 4-week look-ahead plans every week, distributed before the weekly planning meeting

  • Collect actual progress data from Project Engineers, Site Supervisors, and subcontractors at each update cycle

  • Recalculate float and critical path after every update; flag variances before they compound

  • Load labour, plant, equipment, and material quantities into the schedule; generate resource histograms

  • Produce and update S-curves at key milestones for management and client reporting

  • Maintain an interface register linking the programme to procurement lead times, drawing approvals, authority submissions, and subcontractor programmes

About you

  • Degree in Civil Engineering, Construction Management, Quantity Surveying, or equivalent

  • 3 to 4 years of hands-on scheduling experience in industrial, infrastructure, or heavy construction

  • Demonstrated experience building and owning CPM schedules across the full project lifecycle (pre-construction through close-out)

  • Experience with multi-discipline projects covering CSA and M&E works is strongly preferred

  • Proficient in Primavera P6 — this is the core scheduling tool for this role

  • Competent in MS Project as a secondary tool

  • Able to construct WBS, logic ties, milestones, resource histograms, and S-curves from scratch

  • Familiar with CPM critical path methodology, float management, and earned value concepts

  • Understanding of delay analysis techniques (TIA, windows analysis, as-planned vs. as-built)

  • Knowledge of EOT processes and claims documentation in a construction context

Important Information

Never provide your bank or credit card details when applying for jobs. Do not transfer any money or complete unrelated online surveys. If you see something suspicious, Report this Job ad.

Learn More