jobs in AG STAFFING

全职 Substation EHS - HSE Manager (Data Centre Construction) PMC - JB 工作, 薪水 up to MYR 15,000, AG STAFFING Johor 公司招聘中 - Ricebowl

Substation EHS - HSE Manager (Data Centre Construction) PMC - JB

MYR10,000 - MYR15,000 每月
分享
保存

工作地点

  • Johor Bahru Johor Malaysia

职位描述

岗位职责

Substation EHS / HSE Manager (Data Centre Construction) PMC - JB

A Substation Environment, Health, and Safety (EHS) Manager in Malaysia oversees high-voltage electrical safety, regulatory compliance with DOSH (Department of Occupational Safety and Health), and risk mitigation.

Key responsibilities involve managing Permit-to-Work (PTW) systems, leading safety audits for high-risk energization activities, and enforcing zero-incident targets.

Core Responsibilities

Regulatory Compliance: Ensure alignment with the Malaysian Occupational Safety and Health Act (OSHA) and coordinate closely with DOSH.

High-Voltage Safety Management: Oversee Safe Work Method Statements (SWMS), risk assessments (HIRARC), and safety protocols during high-voltage (HV) substation construction, testing, and commissioning.

Permit-to-Work (PTW): Control and audit high-risk work permits for daily site operations and contractor activities.

Incident Prevention: Lead safety inductions, toolbox talks, safety campaigns, and incident root-cause investigations.

Requirements & Qualifications

Certification: Valid registration as a Safety and Health Officer (SHO) with DOSH Malaysia along with specialized green/yellow book credentials or relevant safety certifications.

Experience: Background in managing EHS in high voltage substation projects for data centre, heavy industrial, electrical infrastructure, utility.

Job Types: Full-time, Contract

Pay: RM10,000.00 - RM15,000.00 per month

Work Location: In person

重要安全守则

申请工作时,切勿提供您的银行或信用卡详细资料。不要转账或完成无关的在线调查问卷。如果您发现可疑内容,请举报此招聘广告。

了解更多