jobs in AG STAFFING

全职 Electrical Project Managers - Data Centre Construction - PMC - Johor Bahru 工作, 薪水 up to MYR 18,000, AG STAFFING Johor 公司招聘中 - Ricebowl

Electrical Project Managers - Data Centre Construction - PMC - Johor Bahru

MYR12,000 - MYR18,000 每月
分享
保存

工作地点

  • Johor Bahru Johor Malaysia

职位描述

岗位职责

Electrical Project Managers - Data Centre Construction - PMC - Johor Bahru

Key Responsibilities

1. Technical Execution & Engineering Oversight

  • System Delivery: Oversee the installation of 132kV/33kV sub-stations, MV/LV switchgear, step-down transformers, UPS systems (2N/N+1), backup diesel generators, busduct tracks, and specialized clean earthing systems.
  • Design Review: Evaluate Single-Line Diagrams (SLDs), shop drawings, containment layouts, and engineering calculations to resolve technical clashes before construction begins.
  • Cooling Integration: Coordinate power distribution modifications required for high-density IT racks, including transition paths from traditional air cooling to liquid/direct-to-chip cooling architectures.

2. Project Planning & Procurement

  • Schedule Management: Develop and manage detailed electrical work packages, tracking milestones via MS Project or Primavera P6 to hit strict Ready-for-Service (RFS) deadlines.
  • Long-Lead Tracking: Monitor the manufacturing and delivery of long-lead equipment (e.g., UPS, generators, transformers) to prevent critical path site delays.
  • Subcontractor Management: Supervise electrical subcontractors, evaluate progress claims, and manage variation orders (VOs) alongside the commercial team.

3. Regulatory Compliance, Quality & Safety

  • Utility Coordination: Liaise directly with Tenaga Nasional Berhad (TNB) and Suruhanjaya Tenaga (ST) for grid interconnection, testing approvals, and energization clearance.
  • Statutory Submissions: Work closely with the appointed ST-certified Competent Electrical Engineer to secure legal sign-offs, including Form G and Form H approvals.
  • Site Safety: Enforce strict Lock-Out, Tag-Out (LOTO) systems, High Voltage testing permits, and risk assessment strategies (RAMS) in compliance with CIDB and DOSH guidelines.

Job Types: Full-time, Contract

Pay: RM12,000.00 - RM18,000.00 per month

Work Location: In person

重要安全守则

申请工作时,切勿提供您的银行或信用卡详细资料。不要转账或完成无关的在线调查问卷。如果您发现可疑内容,请举报此招聘广告。

了解更多