jobs in AG STAFFING

全职 Electrical Engineers (Data Centre Construction) JB 工作, 薪水 up to MYR 12,000, AG STAFFING Johor 公司招聘中 - Ricebowl

Electrical Engineers (Data Centre Construction) JB

分享
保存

工作地点

  • Pasir Gudang Johor Malaysia

职位描述

岗位职责

.Job Description: Electrical Engineer

Position Purpose

The Electrical Engineer owns the power infrastructure of the data centre. This role manages everything from the high-voltage utility connection down to the server racks, ensuring continuous, redundant power distribution.

Key Responsibilities

· Power Infrastructure Build: Supervise the installation of HT/MV/LV switchgears, transformers, diesel generators, UPS systems, and Power Distribution Units (PDUs).

· Testing Oversight: Lead the site testing for electrical systems, including insulation testing, protection relay calibration, and load bank testing.

· Authority Liaison: Coordinate with local utility providers (like TNB) and regulatory bodies for testing, energization, and permanent power connection.

· Safety & Compliance: Ensure all electrical installations comply with local safety standards, electrical grid codes, and site health guidelines.

Job Types: Full-time, Contract

Pay: RM6,000.00 - RM12,000.00 per month

Work Location: In person

重要安全守则

申请工作时,切勿提供您的银行或信用卡详细资料。不要转账或完成无关的在线调查问卷。如果您发现可疑内容,请举报此招聘广告。

了解更多