- Johor Bahru Johor Malaysia
工作地点
职位描述
岗位职责
Substation Electrical Managers (Data Centre Construction) - PMC - JB
Key Responsibilities
A Substation Senior Electrical Manager for data centre construction leads the high-voltage power supply, grid connection, and on-site substation infrastructure. Key duties include managing high-voltage (HV/EHV) design, coordinating utility grid integration, and overseeing site installation and safety compliance.
Core Responsibilities
Preferences
Job Types: Full-time, Contract
Pay: RM12,000.00 - RM18,000.00 per month
Work Location: In person
重要安全守则
申请工作时,切勿提供您的银行或信用卡详细资料。不要转账或完成无关的在线调查问卷。如果您发现可疑内容,请举报此招聘广告。