- Johor Bahru Johor Malaysia
工作地点
职位描述
岗位职责
.Job Description: Electrical Engineer
Position Purpose
The Electrical Engineer owns the power infrastructure of the data centre. This role manages everything from the high-voltage utility connection down to the server racks, ensuring continuous, redundant power distribution.
Key Responsibilities
· Power Infrastructure Build: Supervise the installation of HT/MV/LV switchgears, transformers, diesel generators, UPS systems, and Power Distribution Units (PDUs).
· Testing Oversight: Lead the site testing for electrical systems, including insulation testing, protection relay calibration, and load bank testing.
· Authority Liaison: Coordinate with local utility providers (like TNB) and regulatory bodies for testing, energization, and permanent power connection.
· Safety & Compliance: Ensure all electrical installations comply with local safety standards, electrical grid codes, and site health guidelines.
Job Types: Full-time, Contract
Pay: RM6,000.00 - RM12,000.00 per month
Work Location: In person
重要安全守则
申请工作时,切勿提供您的银行或信用卡详细资料。不要转账或完成无关的在线调查问卷。如果您发现可疑内容,请举报此招聘广告。